Skip to content
Opening soonHORIZON-NEB-2027-02-NEB-SOIL-01CINEAOne-off

Reducing soil sealing through sustainable urban and territorial design in the New European Bauhaus

Design solutions that reduce soil sealing in urban, peri-urban and rural areas

EU grant for consortia that develop and demonstrate New European Bauhaus planning and design solutions to reduce soil sealing and land take, improve soil health and strengthen climate resilience and biodiversity.

Opening soon
161
days until opening
Opens on 5 May 2027
HORIZON-NEB-2027-02-NEB-SOIL-01
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Reducing soil sealing through sustainable urban and territorial design in the New European Bauhaus?

Who
Consortia of at least three independent legal entities from three different countries, at least one in an EU Member State and the others in Member States or Associated Countries, that apply the multi-actor approach. Entities established in China cannot take part.
General Annex B; topic HORIZON-NEB-2027-02-NEB-SOIL-01, Eligibility and admissibility conditions
What for
Developing and demonstrating planning and spatial design solutions that prevent soil sealing or unseal soils, improve soil health and strengthen climate resilience and biodiversity, in at least three neighbourhoods (urban, peri-urban and rural) in different countries.
topic HORIZON-NEB-2027-02-NEB-SOIL-01, Expected Outcome and Scope; Glossary: Neighbourhoods
What you get
A grant of up to 70% of the eligible costs (up to 100% for non-profit legal entities), with an expected EU contribution of around EUR 7.5 million per project. The indicative topic budget is EUR 15 million for 2 projects.
General Annex G; topic HORIZON-NEB-2027-02-NEB-SOIL-01, Specific conditions
What you need to do
Submit one proposal in a single stage through the Funding & Tenders Portal between 5 May and 15 September 2027 (17:00 Brussels time), with application form parts A and B and the ethics self-assessment. Experts rank the proposals on excellence, impact and implementation.
topic page, Identification; General Annexes A, D, E and F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

To develop holistic planning and spatial design solutions that apply the New European Bauhaus principles of sustainability, aesthetics and inclusivity to reduce soil sealing and land take and restore soil function, contributing to the Mission Soil objective of no net soil sealing.

01
Regenerative design solutions
Increased number of innovative and regenerative planning and spatial design solutions that apply the New European Bauhaus (NEB) principles of sustainability, aesthetics, and inclusivity to reduce soil sealing and land take, improve soil health, support food systems transformation, and strengthen climate resilience and biodiversity are available.
02
Adoption and upscaling
Increased adoption, upscaling and market uptake of these solutions across diverse territorial contexts (urban, peri-urban, and rural) to enhance soil health, and benefit local communities.
03
Funding models and policy frameworks
Effective funding models and enabling policy frameworks to support territorial transformation.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Reducing soil sealing and land take is a critical challenge for climate and water resilience, ecosystem health, biodiversity, food systems transformation, and the livability of human settlements. As urbanisation and infrastructure development expand across Europe’s urban, peri-urban, and rural areas, healthy soils are increasingly sealed, contributing to the loss of vital ecosystem services and biodiversity and increased vulnerability to climate change impacts. Despite growing awareness, there is a lack of integrated and scalable solutions to address these challenges through spatial design and planning. There is a pressing need for solutions that apply the New European Bauhaus (NEB) principles of sustainability, aesthetics, and inclusivity to develop holistic approaches that restore soil function while enabling regenerative and inclusive territorial development.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
02
Legal entities shall be eligible for funding if they are established in a Member State or an associated country.
04
A multi-actor project ensures the genuine and sufficient involvement of a targeted and diverse range of stakeholders, such as for example but not limited to researchers, farmers, foresters and representatives of their professional associations, advisors, land managers and owners, spatial planners, food and bioeconomy businesses, consumer associations, local communities, educators, cultural and creative industries, citizens, civil society organizations including NGOs, and government representatives.
05
Proposals are expected to address all of the following: … Demonstrate each one of these solutions developed in at least three neighbourhoods (i.e. at least one in urban area, one in peri-urban and one in rural area) located in different Member States and/or Associated Countries;
06
For the purpose of the NEB Facility implementation, a neighbourhood will be understood as an area that either has a maximum of 25 km2 or a maximum of 10,000 inhabitants. A neighbourhood should also be part of or represent the lowest level of a public administration or elected body such as a quarter, borough or district.
07
Accordingly: (1) Innovation Actions: Legal entities established in China are not eligible to participate in any Horizon Europe Innovation Action;
08
In addition, to be eligible, legal entities from Member States and Associated Countries that are public bodies, research organisations or higher education establishments (including private research organisations and private higher education establishments) applying as beneficiaries or affiliated entities must have at the moment of grant signature and during the duration of the grant a gender equality plan, …
Company sizeArticle 22(1)
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Gebiedsgerichte aanpakDemonstratieprojectRegionale en gebiedsontwikkelingMilieu, natuur en biodiversiteitOnderzoek, ontwikkeling en innovatieStedelijke ontwikkelingOpschaling innovatieKlimaatadaptieve inrichtingBouw, vastgoed en ruimtelijke ontwikkelingBiodiversiteit en soortenbeschermingBodembescherming en saneringGebiedsontwikkeling
Project phase
DevelopmentDemonstration
Funding

What do you get?

70% of your eligible project costs.

No binding maximum: the Commission estimates that an EU contribution of around EUR 7.5 million per project would allow the outcomes to be addressed appropriately; this does not preclude proposals requesting different amounts.
€15m · Indicative topic budget, 2 projects expected; EUR 5 million of it comes from the Mission 'A Soil Deal for Europe'. The budget is subject to the availability of appropriations in the EU budget for 2027.
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared to two different EU actions. Costs may be declared under several EU Synergy grants if the cumulative funding does not exceed 100% of the eligible costs. Combination with an EU operating grant is possible if the project stays outside the operating grant work programme and costs are not declared twice.
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

5
MAY
HORIZON-NEB-2027-02-NEB-SOIL-01 opens 5 May 2027
topic page, Identification: Planned opening, Deadline(s), Deadline model
Cycle: Applicants are informed at most 5 months after the deadline; the grant agreement is signed at most 8 months after the deadline. Article 31(1)
Application

How do you apply?

Competitive call
Required, before the full application
  • Application form Part A (administrative information, summarised budget and call-specific questions, filled in online)
  • Application form Part B (technical description of the project, uploaded as PDF), including the plan for the exploitation and dissemination of results with communication activities
  • Ethics self-assessment
Apply through the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; managed by CINEA. Independent experts score proposals on excellence, impact and quality and efficiency of the implementation (each out of 5, threshold 3, overall threshold 10); for ranking Innovation Actions, impact is weighted 1.5.
Eligible costs

What can the money be spent on?

Personnel costs
actual costs (i.e. costs which are real and not estimated or budgeted) for: – personnel costs (unless declared as a unit cost; see below); The maximum Horizon Europe funding rates are as follows: … – Innovation action: 70% (except for non-profit legal entities, where a rate of up to 100% applies)
Materials
actual costs (i.e. costs which are real and not estimated or budgeted) for: … – purchase costs (unless declared as a unit cost; see below);
Subcontracting
actual costs (i.e. costs which are real and not estimated or budgeted) for: … – subcontracting costs;
Equipment
actual costs (i.e. costs which are real and not estimated or budgeted) for: … – purchase costs (unless declared as a unit cost; see below);
Land
Not eligible
Buildings
Not eligible
Overheads
flat-rate (i.e. costs calculated by applying a percentage fixed in advance to other types of eligible costs) for: – indirect costs (25% flat-rate of the total eligible direct costs, excluding eligible direct costs for subcontracting, financial support to third parties and any unit costs or lump sums which include indirect costs);
Travel costs
actual costs (i.e. costs which are real and not estimated or budgeted) for: … – purchase costs (unless declared as a unit cost; see below);
Other costs
Not eligible
Downloads

Files & forms

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Start your application

Start your HORIZON-NEB-2027-02-NEB-SOIL-01 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.