Skip to content
Opening soonHORIZON-NEB-2027-01-REGEN-02CINEAOne-off

Sustainable, beautiful and healthy construction and renovation sites

Construction sites that cause less nuisance for people and nature.

Horizon Europe Research and Innovation Action (RIA, lump sum, approx. €4 million per project) to reduce the negative effects of construction and renovation sites on nature, workers and local residents, with at least 2 solutions and a European charter. Ends at TRL 4-5.

Opening soon
168
days until opening
Opens on 5 May 2027
HORIZON-NEB-2027-01-REGEN-02
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Sustainable, beautiful and healthy construction and renovation sites?

Who
A consortium of at least three independent organisations from three different EU Member States or Associated Countries, at least one of which must be from a Member State; organisations from China cannot participate. Companies of any size, research organisations, public authorities, foundations and associations can participate.
General Annex B (Entities eligible to participate; Entities eligible for funding; Consortium composition)
What for
A Research and Innovation Action to assess and reduce the negative environmental, ecological and health impacts of construction and renovation sites with at least two solutions, and to draw up a draft European charter for construction and renovation sites. The activities reach TRL 4-5 by the end of the project.
Expected Outcome; Scope; Technology Readiness Level
What you get
A lump sum covering 100% of eligible costs; the Commission considers an EU contribution of around €4 million per project appropriate. The indicative budget for the topic is €8 million, expected to fund 2 projects.
Topic HORIZON-NEB-2027-01-REGEN-02 (Expected EU contribution per project; Indicative budget; Legal and financial set-up); General Annex G, Funding rates
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 1 December 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Planned opening date; Deadline date(s); Topic conditions and documents; General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

To reduce the environmental, ecological and health impacts of construction and renovation sites on their surroundings.

01
Awareness of construction site impacts
Actors in the construction ecosystem are more aware of the negative effects of construction and renovation sites on natural ecosystems and on the health and well-being of construction workers and of people living, working or passing by in the surrounding area.
02
Fewer negative effects
A significant reduction in the negative effects of construction and renovation sites on natural ecosystems and on the health and well-being of construction workers and of people in the surrounding area.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Project results are expected to contribute to all of the following expected outcomes: - Construction ecosystem actors are better aware of the negative effects of construction and renovation sites on natural ecosystems as well as on the health and well-being of construction workers and all people living, working or passing through the vicinity. - Significant reduction of negative effects of construction and renovation sites on natural ecosystems, health and well-being of construction workers and all people living, working or passing through the vicinity.

Read more

Construction and renovation sites can significantly contribute to environmental degradation through noise, air pollution, litter and waste.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions: … – countries associated to Horizon Europe
02
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
03
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
04
Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
05
Proposals are expected to address all of the following: … Develop at least two solutions to reduce the negative environmental, ecological and health effects of construction and renovation sites while also paying attention to the visual impact of these sites on their surroundings.
06
Proposals are expected to address all of the following: … Provide recommendations and guidance to construction ecosystem actors on how to reduce the negative environmental, ecological and health effects of construction and renovation sites and develop a draft "European Charter for sound environmental and working environment management of renovation and construction sites" that can be endorsed by companies and entities.
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieBouw, vastgoed en ruimtelijke ontwikkelingVerbouw, renovatie en herbestemming
Project phase
ResearchDevelopment
Funding

What do you get?

100% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €4.0 million per project appropriate (lump sum).
Total scheme budget
€8m · Indicative topic budget, expected to fund 2 projects.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

5
MAY
HORIZON-NEB-2027-01-REGEN-02 opens 5 May 2027
Budget overview
Cycle: Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative information on the participants and summary budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 45 pages)
  • Detailed budget table (HE LS) for the lump sum budget
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Not eligible
Materials
Not eligible
Subcontracting
Not eligible
Equipment
Not eligible
Land
Not eligible
Buildings
Not eligible
Overheads
Not eligible
Travel costs
Not eligible
Other costs
Lump sum: fixed contribution per work package, no reporting of actual costs.
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Bouwplaatsen die minder overlast geven voor mens en natuur.

Now

Construction sites that cause less nuisance for people and nature.

Description
Description: ChangedShow
Before

Bouwpartijen worden zich meer bewust van de negatieve effecten van bouw- en renovatieplaatsen op ecosystemen en op de gezondheid van bouwvakkers en omwonenden, en beperken die aanzienlijk. Projecten brengen effecten als geluid, stof, luchtvervuiling en bodemverdichting in kaart, ontwikkelen en valideren minimaal twee oplossingen met aandacht voor de visuele inpassing, en stellen een concept-Europees charter voor gezonde bouwplaatsen op.

Now

Construction stakeholders become more aware of the negative effects of construction and renovation sites on ecosystems and on the health of construction workers and local residents, and reduce them significantly. Projects map effects such as noise, dust, air pollution and soil compaction, develop and validate at least two solutions with attention to visual integration, and draw up a draft European charter for healthy construction sites.

Short description
Short description: ChangedShow
Before

Horizon Europe-onderzoeks- en innovatieactie (RIA, lump sum, circa € 4 mln per project) om negatieve effecten van bouw- en renovatieplaatsen op natuur, werknemers en omwonenden te beperken, met minimaal 2 oplossingen en een Europees charter. Eindigt op TRL 4-5.

Now

Horizon Europe Research and Innovation Action (RIA, lump sum, approx. €4 million per project) to reduce the negative effects of construction and renovation sites on nature, workers and local residents, with at least 2 solutions and a European charter. Ends at TRL 4-5.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Now

Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 2 projecten.

Now

Indicative topic budget, expected to fund 2 projects.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 4,0 mln EU-bijdrage per project passend (lump sum).

Now

No binding maximum; the Commission considers an EU contribution of around €4.0 million per project appropriate (lump sum).

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
Duurzame en gezonde bouwplaatsen (Horizon NEB) becomes Sustainable and healthy construction sites (Horizon NEB)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-onderzoeksactie (circa € 4 mln per project) om overlast van bouw- en renovatieplaatsen voor natuur, bouwvakkers en omwonenden te beperken.

Now

Horizon Europe research action (around €4 million per project) to limit the nuisance of construction and renovation sites for nature, workers and residents.

Keywords
biodiversiteit, bouwplaatsen, gezondheid bouwvakkers, Horizon Europe, HORIZON-NEB-2027-01-REGEN-02, New European Bauhaus Facility becomes biodiversity, construction sites, construction worker health, Horizon Europe, HORIZON-NEB-2027-01-REGEN-02, New European Bauhaus Facility
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 45 pagina's); Gedetailleerde begrotingstabel (HE LS) voor de lump-sumbegroting becomes Application form Part A: administrative information on the participants and summary budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 45 pages); Detailed budget table (HE LS) for the lump sum budget
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording.

Now

Other costs: Lump sum: fixed contribution per work package, no reporting of actual costs.

Why this scheme
Why this scheme: ChangedShow
Before

Het verminderen van de milieu-, ecologische en gezondheidseffecten van bouw- en renovatieplaatsen op hun omgeving.

Now

To reduce the environmental, ecological and health impacts of construction and renovation sites on their surroundings.

In brief
In brief: ChangedShow
Before

Who: Een consortium van ten minste drie onafhankelijke organisaties uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minstens één uit een lidstaat; organisaties uit China kunnen niet deelnemen. Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen kunnen deelnemen.

What for: Een onderzoeks- en innovatieactie om de negatieve milieu-, ecologische en gezondheidseffecten van bouw- en renovatieplaatsen te beoordelen en te verminderen met ten minste twee oplossingen, en een concept voor een Europees charter voor bouw- en renovatieplaatsen op te stellen. De activiteiten bereiken aan het eind van het project TRL 4-5.

What you get: Een lump sum die 100% van de subsidiabele kosten dekt; de Commissie acht een EU-bijdrage van ongeveer € 4 miljoen per project passend. Het indicatieve budget voor het topic is € 8 miljoen, naar verwachting voor 2 projecten.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: A consortium of at least three independent organisations from three different EU Member States or Associated Countries, at least one of which must be from a Member State; organisations from China cannot participate. Companies of any size, research organisations, public authorities, foundations and associations can participate.

What for: A Research and Innovation Action to assess and reduce the negative environmental, ecological and health impacts of construction and renovation sites with at least two solutions, and to draw up a draft European charter for construction and renovation sites. The activities reach TRL 4-5 by the end of the project.

What you get: A lump sum covering 100% of eligible costs; the Commission considers an EU contribution of around €4 million per project appropriate. The indicative budget for the topic is €8 million, expected to fund 2 projects.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 1 December 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.

Goals
Goals: 2 removed, 2 newShow
Removed

Bewustzijn van effecten van bouwplaatsen Actoren in het bouwecosysteem zijn zich beter bewust van de negatieve effecten van bouw- en renovatieplaatsen op natuurlijke ecosystemen en op de gezondheid en het welzijn van bouwvakkers en van mensen die in de omgeving wonen, werken of passeren.

Minder negatieve effecten Een aanzienlijke vermindering van de negatieve effecten van bouw- en renovatieplaatsen op natuurlijke ecosystemen en op de gezondheid en het welzijn van bouwvakkers en van mensen in de omgeving.

New

Awareness of construction site impacts Actors in the construction ecosystem are more aware of the negative effects of construction and renovation sites on natural ecosystems and on the health and well-being of construction workers and of people living, working or passing by in the surrounding area.

Fewer negative effects A significant reduction in the negative effects of construction and renovation sites on natural ecosystems and on the health and well-being of construction workers and of people in the surrounding area.

Show 4 earlier versions

20 October 2026scheme · version 4

Conditions
Conditions: 2 removed, 6 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Minimaal 2 oplossingen en een concept-charter Projecten ontwikkelen en valideren minimaal twee oplossingen tegen negatieve effecten van bouw- en renovatieplaatsen en stellen een concept 'European Charter for sound environmental and working environment management of renovation and construction sites' op.

New

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions: … – countries associated to Horizon Europe

Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

Proposals are expected to address all of the following: … Develop at least two solutions to reduce the negative environmental, ecological and health effects of construction and renovation sites while also paying attention to the visual impact of these sites on their surroundings.

Proposals are expected to address all of the following: … Provide recommendations and guidance to construction ecosystem actors on how to reduce the negative environmental, ecological and health effects of construction and renovation sites and develop a draft "European Charter for sound environmental and working environment management of renovation and construction sites" that can be endorsed by companies and entities.

In brief
In brief: AddedShow
Now

Who: Een consortium van ten minste drie onafhankelijke organisaties uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minstens één uit een lidstaat; organisaties uit China kunnen niet deelnemen. Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen kunnen deelnemen.

What for: Een onderzoeks- en innovatieactie om de negatieve milieu-, ecologische en gezondheidseffecten van bouw- en renovatieplaatsen te beoordelen en te verminderen met ten minste twee oplossingen, en een concept voor een Europees charter voor bouw- en renovatieplaatsen op te stellen. De activiteiten bereiken aan het eind van het project TRL 4-5.

What you get: Een lump sum die 100% van de subsidiabele kosten dekt; de Commissie acht een EU-bijdrage van ongeveer € 4 miljoen per project passend. Het indicatieve budget voor het topic is € 8 miljoen, naar verwachting voor 2 projecten.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Project results are expected to contribute to all of the following expected outcomes: - Construction ecosystem actors are better aware of the negative effects of construction and renovation sites on natural ecosystems as well as on the health and well-being of construction workers and all people living, working or passing through the vicinity. - Significant reduction of negative effects of construction and renovation sites on natural ecosystems, health and well-being of construction workers and all people living, working or passing through the vicinity. Construction and renovation sites can significantly contribute to environmental degradation through noise, air pollution, litter and waste.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: biodiversiteit, bouwplaatsen, gezondheid bouwvakkers, Horizon Europe, HORIZON-NEB-2027-01-REGEN-02, New European Bauhaus Facility
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 45 pagina's); Gedetailleerde begrotingstabel (HE LS) voor de lump-sumbegroting
Goals
Goals: 2 newShow
New

Bewustzijn van effecten van bouwplaatsen Actoren in het bouwecosysteem zijn zich beter bewust van de negatieve effecten van bouw- en renovatieplaatsen op natuurlijke ecosystemen en op de gezondheid en het welzijn van bouwvakkers en van mensen die in de omgeving wonen, werken of passeren.

Minder negatieve effecten Een aanzienlijke vermindering van de negatieve effecten van bouw- en renovatieplaatsen op natuurlijke ecosystemen en op de gezondheid en het welzijn van bouwvakkers en van mensen in de omgeving.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
11 November 2026 by the Twin editors
Start your application

Start your HORIZON-NEB-2027-01-REGEN-02 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.