Skip to content
Opening soonHORIZON-NEB-2027-01-BUSINESS-01CINEAOne-off

Mass customisation of offsite manufactured modular construction components to transform the existing built environment

Custom modular construction components for the renovation of existing buildings.

Horizon Europe Innovation Action (IA, lump sum, around €5 million per project) for mass customisation of prefabricated modular construction components to transform the existing built environment, demonstrated in at least 3 countries. No entities under Chinese control.

Opening soon
168
days until opening
Opens on 5 May 2027
HORIZON-NEB-2027-01-BUSINESS-01
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Mass customisation of offsite manufactured modular construction components to transform the existing built environment?

Who
A consortium of at least three independent organisations from three different EU Member States or Associated Countries, at least one of which is from a Member State; organisations directly or indirectly controlled by China cannot participate. Companies of any size, research organisations, public authorities, foundations and associations can participate.
General Annex B (Entities eligible to participate; Entities eligible for funding; Consortium composition)
What for
An Innovation Action for the mass customisation of modular construction components manufactured offsite, for affordable, sustainable and beautiful renovation of the existing built environment. The solution is demonstrated in at least three countries and for at least three application areas.
Expected Outcome; Scope
What you get
A lump sum covering 70% of eligible costs (up to 100% for non-profit organisations); the Commission considers an EU contribution of around €5 million per project appropriate. The indicative budget for the topic is €10 million, expected to fund 2 projects.
Topic HORIZON-NEB-2027-01-BUSINESS-01 (Expected EU contribution per project; Indicative budget; Legal and financial set-up); General Annex G, Funding rates
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 1 December 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Planned opening date; Deadline date(s); Topic conditions and documents; General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

To scale up affordable, sustainable and beautiful renovation of the existing built environment through customised modular construction components, in line with the New European Bauhaus.

01
Mass customisation in construction
Stakeholders in the construction and renovation ecosystem apply innovative solutions for the mass customisation of offsite manufactured modular construction components.
02
Less waste and environmental impact
Significantly less waste and environmental impact (including air quality, noise and transport) and greater local cultural heritage and aesthetics of the built environment than with conventional modular construction.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Project results are expected to contribute to all of the following expected outcomes: - Stakeholders involved in the construction and renovation ecosystem adopt innovative solutions for the mass customisation of offsite manufactured modular construction components. - Significantly reduced waste and environmental impacts (including air quality, noise and transportation) and enhanced local cultural heritage and/or aesthetics of the built environment compared to using conventional modular construction components.

Read more

Solutions to transform the existing built environment in line with the New European Bauhaus (NEB) have typically been at smaller, individual scale so far.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions: … – countries associated to Horizon Europe
02
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
03
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
04
Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
05
Proposals are expected to address all of the following: … Demonstrate the innovative solution in an operational environment in at least three Member States and/or Associated Countries. Mass customisation of the modular construction components should address the needs of at least three application areas (e.g. residential, commercial, public space, cultural heritage, education, recreation).
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieBouw, vastgoed en ruimtelijke ontwikkelingVerbouw, renovatie en herbestemming
Project phase
DevelopmentDemonstration
Funding

What do you get?

70% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €5.0 million per project appropriate (lump sum). Funding rate 70%; non-profit organisations 100%.
Total scheme budget
€10m · Indicative topic budget, expected to fund 2 projects.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

5
MAY
HORIZON-NEB-2027-01-BUSINESS-01 opens 5 May 2027
Budget overview
Cycle: Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative details of the participants and summary budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 45 pages)
  • Detailed budget table (Detailed budget table HE LS, Excel), mandatory for lump sum funding
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Not eligible
Materials
Not eligible
Subcontracting
Not eligible
Equipment
Not eligible
Land
Not eligible
Buildings
Not eligible
Overheads
Not eligible
Travel costs
Not eligible
Other costs
Lump sum: fixed contribution per work package, no cost reporting. Funding rate 70%; non-profit organisations receive 100% (General Annex G).
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Modulaire bouwcomponenten op maat voor de renovatie van bestaande gebouwen.

Now

Custom modular construction components for the renovation of existing buildings.

Description
Description: ChangedShow
Before

Bouw- en renovatiepartijen gaan innovatieve oplossingen gebruiken voor massamaatwerk van offsite geproduceerde modulaire bouwcomponenten, met minder afval en milieu-impact en meer aandacht voor lokaal erfgoed en esthetiek. Projecten ontwikkelen zo'n oplossing met onder meer gedistribueerde productie en BIM, demonstreren die in een operationele omgeving in minimaal drie landen voor minimaal drie toepassingsgebieden, en onderzoeken waarde, businesscase en opschaling.

Now

Construction and renovation stakeholders will use innovative solutions for mass customisation of offsite manufactured modular construction components, with less waste and environmental impact and greater attention to local heritage and aesthetics. Projects develop such a solution, including distributed manufacturing and BIM, demonstrate it in an operational environment in at least three countries for at least three application areas, and examine value, business case and scale-up.

Short description
Short description: ChangedShow
Before

Horizon Europe-innovatieactie (IA, lump sum, circa € 5 mln per project) voor massamaatwerk van prefab modulaire bouwcomponenten om de bestaande gebouwde omgeving te transformeren, gedemonstreerd in minimaal 3 landen. Geen entiteiten onder Chinese zeggenschap.

Now

Horizon Europe Innovation Action (IA, lump sum, around €5 million per project) for mass customisation of prefabricated modular construction components to transform the existing built environment, demonstrated in at least 3 countries. No entities under Chinese control.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Now

Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 2 projecten.

Now

Indicative topic budget, expected to fund 2 projects.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 5,0 mln EU-bijdrage per project passend (lump sum). Financieringspercentage 70%; non-profitorganisaties 100%.

Now

No binding maximum; the Commission considers an EU contribution of around €5.0 million per project appropriate (lump sum). Funding rate 70%; non-profit organisations 100%.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
Modulaire bouwcomponenten op maat (Horizon NEB) becomes Custom modular construction components (Horizon NEB)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-innovatieactie (circa € 5 mln per project) voor massamaatwerk van prefab modulaire bouwcomponenten voor renovatie van bestaande gebouwen.

Now

Horizon Europe Innovation Action (around €5 million per project): mass customisation of prefab modular building components for renovating existing buildings.

Keywords
Horizon Europe, HORIZON-NEB-2027-01-BUSINESS-01, modulair bouwen, New European Bauhaus, New European Bauhaus Facility, prefabricage, renovatie becomes Horizon Europe, HORIZON-NEB-2027-01-BUSINESS-01, modular construction, New European Bauhaus, New European Bauhaus Facility, prefabrication, renovation
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 45 pagina's); Gedetailleerde begrotingstabel (Detailed budget table HE LS, Excel), verplicht bij lumpsumfinanciering becomes Application form Part A: administrative details of the participants and summary budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 45 pages); Detailed budget table (Detailed budget table HE LS, Excel), mandatory for lump sum funding
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording. Financieringspercentage 70%; non-profitorganisaties ontvangen 100% (General Annex G).

Now

Other costs: Lump sum: fixed contribution per work package, no cost reporting. Funding rate 70%; non-profit organisations receive 100% (General Annex G).

Why this scheme
Why this scheme: ChangedShow
Before

Het opschalen van betaalbare, duurzame en mooie renovatie van de bestaande gebouwde omgeving via modulaire bouwcomponenten op maat, in lijn met het New European Bauhaus.

Now

To scale up affordable, sustainable and beautiful renovation of the existing built environment through customised modular construction components, in line with the New European Bauhaus.

In brief
In brief: ChangedShow
Before

Who: Een consortium van ten minste drie onafhankelijke organisaties uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minstens één uit een lidstaat; organisaties die direct of indirect door China worden gecontroleerd kunnen niet deelnemen. Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen kunnen deelnemen.

What for: Een innovatieactie om modulaire bouwcomponenten die buiten de bouwplaats worden gemaakt op maat in massa te produceren, voor een betaalbare, duurzame en mooie renovatie van de bestaande gebouwde omgeving. De oplossing wordt gedemonstreerd in ten minste drie landen en voor ten minste drie toepassingsgebieden.

What you get: Een lump sum die 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties) dekt; de Commissie acht een EU-bijdrage van ongeveer € 5 miljoen per project passend. Het indicatieve budget voor het topic is € 10 miljoen, naar verwachting voor 2 projecten.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: A consortium of at least three independent organisations from three different EU Member States or Associated Countries, at least one of which is from a Member State; organisations directly or indirectly controlled by China cannot participate. Companies of any size, research organisations, public authorities, foundations and associations can participate.

What for: An Innovation Action for the mass customisation of modular construction components manufactured offsite, for affordable, sustainable and beautiful renovation of the existing built environment. The solution is demonstrated in at least three countries and for at least three application areas.

What you get: A lump sum covering 70% of eligible costs (up to 100% for non-profit organisations); the Commission considers an EU contribution of around €5 million per project appropriate. The indicative budget for the topic is €10 million, expected to fund 2 projects.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 1 December 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.

Goals
Goals: 2 removed, 2 newShow
Removed

Mass customisation in de bouw Partijen in het bouw- en renovatie-ecosysteem passen innovatieve oplossingen toe voor mass customisation van extern geproduceerde modulaire bouwcomponenten.

Minder afval en milieubelasting Aanzienlijk minder afval en milieu-impact (waaronder luchtkwaliteit, geluid en transport) en meer lokaal cultureel erfgoed en esthetiek van de gebouwde omgeving dan bij conventionele modulaire bouw.

New

Mass customisation in construction Stakeholders in the construction and renovation ecosystem apply innovative solutions for the mass customisation of offsite manufactured modular construction components.

Less waste and environmental impact Significantly less waste and environmental impact (including air quality, noise and transport) and greater local cultural heritage and aesthetics of the built environment than with conventional modular construction.

Show 4 earlier versions

20 October 2026scheme · version 4

Conditions
Conditions: 3 removed, 5 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Geen entiteiten onder Chinese zeggenschap In een subsidiabel land gevestigde entiteiten die direct of indirect worden gecontroleerd door China of een in China gevestigde juridische entiteit mogen niet deelnemen (beperking voor innovatieacties in kritieke technologiegebieden, General Annex B).

Demonstratie in minimaal 3 landen De oplossing wordt gedemonstreerd in een operationele omgeving in minimaal drie EU-lidstaten en/of geassocieerde landen, voor minimaal drie toepassingsgebieden (bijvoorbeeld wonen, commercieel, openbare ruimte, erfgoed, onderwijs, recreatie).

New

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions: … – countries associated to Horizon Europe

In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

Proposals are expected to address all of the following: … Demonstrate the innovative solution in an operational environment in at least three Member States and/or Associated Countries. Mass customisation of the modular construction components should address the needs of at least three application areas (e.g. residential, commercial, public space, cultural heritage, education, recreation).

In brief
In brief: AddedShow
Now

Who: Een consortium van ten minste drie onafhankelijke organisaties uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minstens één uit een lidstaat; organisaties die direct of indirect door China worden gecontroleerd kunnen niet deelnemen. Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen kunnen deelnemen.

What for: Een innovatieactie om modulaire bouwcomponenten die buiten de bouwplaats worden gemaakt op maat in massa te produceren, voor een betaalbare, duurzame en mooie renovatie van de bestaande gebouwde omgeving. De oplossing wordt gedemonstreerd in ten minste drie landen en voor ten minste drie toepassingsgebieden.

What you get: Een lump sum die 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties) dekt; de Commissie acht een EU-bijdrage van ongeveer € 5 miljoen per project passend. Het indicatieve budget voor het topic is € 10 miljoen, naar verwachting voor 2 projecten.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Project results are expected to contribute to all of the following expected outcomes: - Stakeholders involved in the construction and renovation ecosystem adopt innovative solutions for the mass customisation of offsite manufactured modular construction components. - Significantly reduced waste and environmental impacts (including air quality, noise and transportation) and enhanced local cultural heritage and/or aesthetics of the built environment compared to using conventional modular construction components. Solutions to transform the existing built environment in line with the New European Bauhaus (NEB) have typically been at smaller, individual scale so far.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: Horizon Europe, HORIZON-NEB-2027-01-BUSINESS-01, modulair bouwen, New European Bauhaus, New European Bauhaus Facility, prefabricage, renovatie
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 45 pagina's); Gedetailleerde begrotingstabel (Detailed budget table HE LS, Excel), verplicht bij lumpsumfinanciering
Goals
Goals: 2 newShow
New

Mass customisation in de bouw Partijen in het bouw- en renovatie-ecosysteem passen innovatieve oplossingen toe voor mass customisation van extern geproduceerde modulaire bouwcomponenten.

Minder afval en milieubelasting Aanzienlijk minder afval en milieu-impact (waaronder luchtkwaliteit, geluid en transport) en meer lokaal cultureel erfgoed en esthetiek van de gebouwde omgeving dan bij conventionele modulaire bouw.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
11 November 2026 by the Twin editors
Start your application

Start your HORIZON-NEB-2027-01-BUSINESS-01 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.