Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies
Retrofitting existing infrastructure with innovative energy storage.
Horizon Europe Innovation Action (IA, lump sum) demonstrating new or improved energy storage technology in ageing or decommissioned energy or other infrastructure.
This grant database is in beta
Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.
What is Integrated Approaches for Retrofitting Infrastructures with Innovative Energy Storage Technologies?
Built from the details on this page, with nothing added by us.
Why does this scheme exist?
Delivering additional flexible storage capacity using existing infrastructure.
About the scheme
Compiled from passages of the scheme's official publication, with nothing added by us.
Project results are expected to contribute to all the following expected outcomes: - Improved energy security of the energy system by offering cost-effective and efficient solutions for additional diverse and flexible energy storage capacities. - Improve the sustainability and circularity of energy storage systems. - Enhanced economic viability of energy storage by utilizing existing infrastructures.
Read moreRead less
Demonstration of novel or improved technological solutions for cost-efficient, circular and sustainable energy storage, which contribute to grid flexibility and make use of existing obsolete or outdated energy or other infrastructures.
Conditions
Quoted verbatim from the scheme, with the article that sets each condition.
What do you get?
70% of your eligible project costs.
Deadlines & cycles
How do you apply?
- Application form Part A: administrative details of the participants and summarised budget (to be completed online)
- Application form Part B: technical description of the project (PDF, maximum 45 pages for a lump sum IA)
- Detailed budget table (HE LS template in the submission system)
What can the money be spent on?
Files & forms
What has changed?
10 November 2026scheme · version 5
Subtitle: ChangedShowHide
Bestaande infrastructuur ombouwen met innovatieve energieopslag.
Retrofitting existing infrastructure with innovative energy storage.
Description: ChangedShowHide
Projecten demonstreren kostenefficiënte, circulaire en duurzame energieopslag die bijdraagt aan netflexibiliteit en gebruikmaakt van verouderde of buiten gebruik geraakte infrastructuur, en combineren opslagtechnologie met de renovatie daarvan. Activiteiten bereiken TRL 6-8; entiteiten onder Chinese controle zijn uitgesloten.
Projects demonstrate cost-efficient, circular and sustainable energy storage that contributes to grid flexibility and makes use of ageing or decommissioned infrastructure, combining storage technology with the retrofitting of that infrastructure. Activities reach TRL 6-8; entities controlled by China are excluded.
Short description: ChangedShowHide
Horizon Europe-innovatieactie (IA, lump sum) die nieuwe of verbeterde energieopslagtechnologie demonstreert in verouderde of buiten gebruik geraakte energie- of andere infrastructuur.
Horizon Europe Innovation Action (IA, lump sum) demonstrating new or improved energy storage technology in ageing or decommissioned energy or other infrastructure.
Cycle: ChangedShowHide
Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).
Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F).
Note on the total budget: ChangedShowHide
Indicatief topicbudget, naar verwachting 3 projecten.
Indicative topic budget, 3 projects expected to be funded.
Note on the maximum: ChangedShowHide
Geen bindend maximum; de Commissie acht circa € 7,5 mln EU-bijdrage per project passend (lump sum).
No binding maximum; the Commission considers an EU contribution of around €7.5 million per project appropriate (lump sum).
Cumulation: ChangedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared under two different EU actions (General Annex G).
Search engine description: ChangedShowHide
Horizon Europe-innovatieactie (lump sum, circa € 7,5 mln per project) voor energieopslag in hergebruikte infrastructuur.
Horizon Europe innovation action (lump sum, around €7.5 million per project) for energy storage in repurposed infrastructure.
Procedure: ChangedShowHide
Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Notes per cost type: ChangedShowHide
Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording. Financieringspercentage 70%; 100% voor non-profitorganisaties (General Annex G).
Other costs: Lump sum: fixed contribution per work package, no cost reporting. Funding rate 70%; 100% for non-profit organisations (General Annex G).
Why this scheme: ChangedShowHide
Extra flexibele opslagcapaciteit realiseren met bestaande infrastructuur.
Delivering additional flexible storage capacity using existing infrastructure.
In brief: ChangedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke juridische entiteiten uit drie verschillende landen, waarvan minstens één uit een EU-lidstaat en de andere uit EU-lidstaten of met Horizon Europe geassocieerde landen. Entiteiten uit China, of in een subsidiabel land maar onder zeggenschap van China, mogen niet deelnemen.
What for: Demonstratie van nieuwe of verbeterde energieopslagtechnologieën die bestaande, verouderde infrastructuur hergebruiken (zoals oude stuwdammen, buiten gebruik gestelde centrales of mijnen), om extra flexibele opslagcapaciteit te realiseren. De activiteiten moeten aan het eind van het project TRL 6-8 bereiken.
What you get: Een lump-sum-subsidie van 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van ongeveer € 7,5 miljoen per project passend. Het indicatieve budget voor het topic is € 22,5 miljoen.
What you need to do: Dien van 4 augustus 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent legal entities from three different countries, at least one of which is from an EU Member State and the others from EU Member States or Countries associated with Horizon Europe. Entities from China, or established in an eligible country but controlled by China, may not participate.
What for: Demonstration of new or improved energy storage technologies that repurpose existing, ageing infrastructure (such as old dams, decommissioned power plants or mines) to deliver additional flexible storage capacity. Activities must reach TRL 6-8 by the end of the project.
What you get: A lump sum grant covering 70% of eligible costs (up to 100% for non-profit organisations); the Commission considers an EU contribution of approximately €7.5 million per project appropriate. The indicative budget for the topic is €22.5 million.
What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal between 4 August 2027 and 1 December 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.
Goals: 3 removed, 3 newShowHide
Meer energiezekerheid door opslag Kosteneffectieve en efficiënte oplossingen voor extra, diverse en flexibele energieopslagcapaciteit verbeteren de energiezekerheid van het energiesysteem.
Duurzamere en circulaire opslagsystemen De duurzaamheid en circulariteit van energieopslagsystemen worden verbeterd.
Rendabele opslag in bestaande infrastructuur Energieopslag wordt economisch rendabeler doordat bestaande infrastructuur wordt benut.
Greater energy security through storage Cost-effective and efficient solutions for additional, diverse and flexible energy storage capacity improve the energy security of the energy system.
More sustainable and circular storage systems The sustainability and circularity of energy storage systems are improved.
Cost-effective storage in existing infrastructure Energy storage becomes more economically viable by making use of existing infrastructure.
Show 4 earlier versionsShow less
19 October 2026scheme · version 4
Conditions: 2 removed, 6 newShowHide
Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).
Geen deelname van entiteiten onder Chinese controle Entiteiten die direct of indirect worden gecontroleerd door China of een in China gevestigde entiteit mogen niet deelnemen (restrictie voor innovatieacties in kritieke technologiegebieden, General Annex B).
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In brief: AddedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke juridische entiteiten uit drie verschillende landen, waarvan minstens één uit een EU-lidstaat en de andere uit EU-lidstaten of met Horizon Europe geassocieerde landen. Entiteiten uit China, of in een subsidiabel land maar onder zeggenschap van China, mogen niet deelnemen.
What for: Demonstratie van nieuwe of verbeterde energieopslagtechnologieën die bestaande, verouderde infrastructuur hergebruiken (zoals oude stuwdammen, buiten gebruik gestelde centrales of mijnen), om extra flexibele opslagcapaciteit te realiseren. De activiteiten moeten aan het eind van het project TRL 6-8 bereiken.
What you get: Een lump-sum-subsidie van 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van ongeveer € 7,5 miljoen per project passend. Het indicatieve budget voor het topic is € 22,5 miljoen.
What you need to do: Dien van 4 augustus 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
18 October 2026scheme · version 3
About the scheme: AddedShowHide
Project results are expected to contribute to all the following expected outcomes: - Improved energy security of the energy system by offering cost-effective and efficient solutions for additional diverse and flexible energy storage capacities. - Improve the sustainability and circularity of energy storage systems. - Enhanced economic viability of energy storage by utilizing existing infrastructures. Demonstration of novel or improved technological solutions for cost-efficient, circular and sustainable energy storage, which contribute to grid flexibility and make use of existing obsolete or outdated energy or other infrastructures.
16 October 2026scheme · version 2
Cycle: AddedShowHide
Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).
Cumulation: AddedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
Goals: 3 newShowHide
Meer energiezekerheid door opslag Kosteneffectieve en efficiënte oplossingen voor extra, diverse en flexibele energieopslagcapaciteit verbeteren de energiezekerheid van het energiesysteem.
Duurzamere en circulaire opslagsystemen De duurzaamheid en circulariteit van energieopslagsystemen worden verbeterd.
Rendabele opslag in bestaande infrastructuur Energieopslag wordt economisch rendabeler doordat bestaande infrastructuur wordt benut.
8 October 2026scheme · version 1 · first publication
Contact & source
Start your HORIZON-CL5-2027-07-D3-27 application
in Twin.
Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.