Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids

Advanced distribution management systems for more efficient and flexible distribution grids.

Horizon Europe Innovation Action (IA) for advanced distribution management systems (ADMS) that enable grid operators to manage congestion better and integrate distributed energy resources efficiently.

Opening soon
259
days until opening
Opens on 4 August 2027
HORIZON-CL5-2027-07-D3-26
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids?

Who
Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent legal entities from three different countries, of which at least one is from an EU Member State and the others from EU Member States or Horizon Europe Associated Countries. Entities from China, or established in an eligible country but controlled by China, may not participate.
General Annex B (Entities eligible to participate, Entities eligible for funding, Consortium composition); Destination introduction; Specific conditions, Eligibility conditions
What for
Advanced distribution management systems (ADMS) for more efficient and flexible distribution grids, so that grid operators can better manage congestion in distribution grids. Activities must reach TRL 6-8 by the end of the project.
Expected Outcome; Scope; Specific conditions, Technology Readiness Level
What you get
A grant covering 70% of eligible costs (up to 100% for non-profit organisations); the Commission considers an EU contribution of around €9.5 million per project appropriate. The indicative budget for the topic is €28.5 million.
Specific conditions (Expected EU contribution per project, Indicative budget); General Annex G (Funding rates)
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 4 August 2027 until 1 December 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.
Dates; General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

Better management of grid congestion in distribution grids.

01
More reliable and flexible distribution grids
Electricity distribution grids become more reliable, resilient, controllable and efficient, and congestion in the distribution grid is managed effectively.
02
Digital grid management at DSOs
Distribution system operators (DSOs) deploy modern digital solutions and improved systems to manage their grids and improve interoperability with TSOs and other DSOs.
03
Vendor-independent reference architectures
Vendor-independent reference architectures, solutions and tools are developed that improve the design and operation of ADMS and help manage a wide range of grid services.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Project results are expected to contribute to all the following expected outcomes: - Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; - Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; - Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
02
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
03
Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
04
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
05
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
06
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Netcongestie en flexibiliteitOnderzoek, ontwikkeling en innovatieEnergie, klimaat en verduurzaming
Project phase
DevelopmentDemonstration
Funding

What do you get?

70% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €9.5 million per project appropriate.
€28.5m · Indicative topic budget, 3 projects expected to be funded.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

4
AUG
HORIZON-CL5-2027-07-D3-26 opens 4 August 2027
Dates (Action: opening and deadline)
Cycle: Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Competitive call
Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative data of the participants and summarised budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 40 pages for an IA)
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Materials
Subcontracting
Equipment
Land
Not eligible
Buildings
Not eligible
Overheads
Travel costs
Other costs
Actual costs according to the Horizon Europe Model Grant Agreement (personnel, subcontracting, travel, equipment and other goods and services costs) plus 25% flat-rate indirect costs. Funding rate 70%; 100% for non-profit organisations (General Annex G).
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Geavanceerde distributiebeheersystemen voor efficiëntere en flexibelere distributienetten.

Now

Advanced distribution management systems for more efficient and flexible distribution grids.

Description
Description: ChangedShow
Before

Projecten ontwerpen en testen innovatieve oplossingen, architecturen en softwareplatforms voor geavanceerde distributiebeheersystemen die de prestaties en bestuurbaarheid van distributienetten verbeteren, decentrale energiebronnen integreren, congestie verminderen en de samenwerking met TSO's verbeteren. Activiteiten bereiken TRL 6-8; entiteiten onder Chinese controle zijn uitgesloten.

Now

Projects design and test innovative solutions, architectures and software platforms for advanced distribution management systems that improve the performance and controllability of distribution grids, integrate distributed energy resources, reduce congestion and improve cooperation with TSOs. Activities reach TRL 6-8; entities under Chinese control are excluded.

Short description
Short description: ChangedShow
Before

Horizon Europe-innovatieactie (IA) voor geavanceerde distributiebeheersystemen (ADMS) waarmee netbeheerders congestie beter beheersen en decentrale energiebronnen efficiënt integreren.

Now

Horizon Europe Innovation Action (IA) for advanced distribution management systems (ADMS) that enable grid operators to manage congestion better and integrate distributed energy resources efficiently.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Now

Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 3 projecten.

Now

Indicative topic budget, 3 projects expected to be funded.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 9,5 mln EU-bijdrage per project passend.

Now

No binding maximum; the Commission considers an EU contribution of around €9.5 million per project appropriate.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
Distributiebeheersystemen (ADMS) (Horizon CL5) becomes Distribution Management Systems (ADMS) (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-innovatieactie (circa € 9,5 mln per project) voor geavanceerde distributiebeheersystemen tegen netcongestie.

Now

Horizon Europe innovation action (around €9.5 million per project) for advanced distribution management systems to tackle grid congestion.

Keywords
ADMS, Cluster 5 Climate, Energy and Mobility, congestiemanagement, distributienetten, Horizon Europe, HORIZON-CL5-2027-07-D3-26, netbeheer becomes ADMS, Cluster 5 Climate, Energy and Mobility, congestion management, distribution grids, grid management, Horizon Europe, HORIZON-CL5-2027-07-D3-26
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 40 pagina's voor een IA) becomes Application form Part A: administrative data of the participants and summarised budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 40 pages for an IA)
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Werkelijke kosten volgens de Horizon Europe-modelsubsidieovereenkomst (personeel, onderaanneming, reis-, apparatuur- en overige goederen- en dienstenkosten) plus 25% forfaitaire indirecte kosten. Financieringspercentage 70%; 100% voor non-profitorganisaties (General Annex G).

Now

Other costs: Actual costs according to the Horizon Europe Model Grant Agreement (personnel, subcontracting, travel, equipment and other goods and services costs) plus 25% flat-rate indirect costs. Funding rate 70%; 100% for non-profit organisations (General Annex G).

Why this scheme
Why this scheme: ChangedShow
Before

Netcongestie in distributienetten beter beheersen.

Now

Better management of grid congestion in distribution grids.

In brief
In brief: ChangedShow
Before

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke juridische entiteiten uit drie verschillende landen, waarvan minstens één uit een EU-lidstaat en de andere uit EU-lidstaten of met Horizon Europe geassocieerde landen. Entiteiten uit China, of in een subsidiabel land maar onder zeggenschap van China, mogen niet deelnemen.

What for: Geavanceerde distributiebeheersystemen (ADMS) voor efficiëntere en flexibelere distributienetten, zodat netbeheerders congestie in distributienetten beter beheersen. De activiteiten moeten aan het eind van het project TRL 6-8 bereiken.

What you get: Een subsidie van 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van ongeveer € 9,5 miljoen per project passend. Het indicatieve budget voor het topic is € 28,5 miljoen.

What you need to do: Dien van 4 augustus 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent legal entities from three different countries, of which at least one is from an EU Member State and the others from EU Member States or Horizon Europe Associated Countries. Entities from China, or established in an eligible country but controlled by China, may not participate.

What for: Advanced distribution management systems (ADMS) for more efficient and flexible distribution grids, so that grid operators can better manage congestion in distribution grids. Activities must reach TRL 6-8 by the end of the project.

What you get: A grant covering 70% of eligible costs (up to 100% for non-profit organisations); the Commission considers an EU contribution of around €9.5 million per project appropriate. The indicative budget for the topic is €28.5 million.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 4 August 2027 until 1 December 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.

Goals
Goals: 3 removed, 3 newShow
Removed

Betrouwbaardere en flexibelere distributienetten Elektriciteitsdistributienetten worden betrouwbaarder, veerkrachtiger, beter regelbaar en efficiënter, en congestie in het distributienet wordt effectief beheerd.

Digitaal netbeheer bij DSO's Distributienetbeheerders (DSO's) zetten moderne digitale oplossingen en verbeterde systemen in om hun netten te beheren en de interoperabiliteit met TSO's en andere DSO's te verbeteren.

Leveranciersonafhankelijke referentiearchitecturen Er komen leveranciersonafhankelijke referentiearchitecturen, oplossingen en tools die het ontwerp en de werking van ADMS verbeteren en een breed scala aan netdiensten helpen beheren.

New

More reliable and flexible distribution grids Electricity distribution grids become more reliable, resilient, controllable and efficient, and congestion in the distribution grid is managed effectively.

Digital grid management at DSOs Distribution system operators (DSOs) deploy modern digital solutions and improved systems to manage their grids and improve interoperability with TSOs and other DSOs.

Vendor-independent reference architectures Vendor-independent reference architectures, solutions and tools are developed that improve the design and operation of ADMS and help manage a wide range of grid services.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 2 removed, 6 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Geen deelname van entiteiten onder Chinese controle Entiteiten die direct of indirect worden gecontroleerd door China of een in China gevestigde entiteit mogen niet deelnemen (restrictie voor innovatieacties in kritieke technologiegebieden, General Annex B).

New

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.

In brief
In brief: AddedShow
Now

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke juridische entiteiten uit drie verschillende landen, waarvan minstens één uit een EU-lidstaat en de andere uit EU-lidstaten of met Horizon Europe geassocieerde landen. Entiteiten uit China, of in een subsidiabel land maar onder zeggenschap van China, mogen niet deelnemen.

What for: Geavanceerde distributiebeheersystemen (ADMS) voor efficiëntere en flexibelere distributienetten, zodat netbeheerders congestie in distributienetten beter beheersen. De activiteiten moeten aan het eind van het project TRL 6-8 bereiken.

What you get: Een subsidie van 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van ongeveer € 9,5 miljoen per project passend. Het indicatieve budget voor het topic is € 28,5 miljoen.

What you need to do: Dien van 4 augustus 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Project results are expected to contribute to all the following expected outcomes: - Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively; - Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs; - Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: ADMS, Cluster 5 Climate, Energy and Mobility, congestiemanagement, distributienetten, Horizon Europe, HORIZON-CL5-2027-07-D3-26, netbeheer
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 40 pagina's voor een IA)
Goals
Goals: 3 newShow
New

Betrouwbaardere en flexibelere distributienetten Elektriciteitsdistributienetten worden betrouwbaarder, veerkrachtiger, beter regelbaar en efficiënter, en congestie in het distributienet wordt effectief beheerd.

Digitaal netbeheer bij DSO's Distributienetbeheerders (DSO's) zetten moderne digitale oplossingen en verbeterde systemen in om hun netten te beheren en de interoperabiliteit met TSO's en andere DSO's te verbeteren.

Leveranciersonafhankelijke referentiearchitecturen Er komen leveranciersonafhankelijke referentiearchitecturen, oplossingen en tools die het ontwerp en de werking van ADMS verbeteren en een breed scala aan netdiensten helpen beheren.

8 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
18 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2027-07-D3-26 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.