Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants
Demonstrating hydropower technology for the refurbishment of existing plants.
Horizon Europe innovation action (IA, lump sum) demonstrating technology for the efficient and forward-looking refurbishment of existing hydropower plants, with a focus on flexibility, grid integration and sustainability.
This grant database is in beta
Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.
What is Demonstration of hydropower technologies for efficient and forward-looking refurbishment of existing hydropower plants?
Built from the details on this page, with nothing added by us.
Why does this scheme exist?
To use existing hydropower more flexibly and sustainably in a renewable electricity system.
About the scheme
Compiled from passages of the scheme's official publication, with nothing added by us.
For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal.
Read moreRead less
Project results are expected to contribute to all of the following expected outcomes: - Enhancing the capacities of the hydropower fleet to contribute with variable renewables base load to a secure and stable electricity system, including by modernising grid integration and hydropower fleet control. - Increase technology leadership, competitiveness and technology export potential of European hydropower industry. - Address challenges of climate change adaptation for a forward-looking and stable operation of sustainable hydropower for the coming decades.
Conditions
Quoted verbatim from the scheme, with the article that sets each condition.
What do you get?
70% of your eligible project costs.
Deadlines & cycles
How do you apply?
- Application form Part A: administrative data of participants and summarised budget (to be completed online)
- Application form Part B: technical description of the project (PDF, maximum 45 pages for a lump sum IA)
- Detailed budget table (HE LS template in the submission system)
What can the money be spent on?
Files & forms
What has changed?
10 November 2026scheme · version 5
Subtitle: ChangedShowHide
Waterkrachttechnologie demonstreren voor de renovatie van bestaande centrales.
Demonstrating hydropower technology for the refurbishment of existing plants.
Description: ChangedShowHide
Projecten demonstreren oplossingen voor de renovatie van bestaande waterkrachtcentrales, zoals innovatieve turbineontwerpen, die de flexibiliteit en netintegratie van waterkracht verbeteren en sociaaleconomisch en ecologisch duurzaam zijn (inclusief biodiversiteit), met een bijbehorende beoordeling. Activiteiten bereiken TRL 6-7; entiteiten onder Chinese controle zijn uitgesloten.
Projects demonstrate solutions for the refurbishment of existing hydropower plants, such as innovative turbine designs, that improve the flexibility and grid integration of hydropower and are socio-economically and environmentally sustainable (including biodiversity), with an accompanying assessment. Activities reach TRL 6-7; entities under Chinese control are excluded.
Short description: ChangedShowHide
Horizon Europe-innovatieactie (IA, lump sum) die technologie demonstreert voor een efficiënte en toekomstgerichte renovatie van bestaande waterkrachtcentrales, met aandacht voor flexibiliteit, netintegratie en duurzaamheid.
Horizon Europe innovation action (IA, lump sum) demonstrating technology for the efficient and forward-looking refurbishment of existing hydropower plants, with a focus on flexibility, grid integration and sustainability.
Cycle: ChangedShowHide
Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).
Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F).
Note on the total budget: ChangedShowHide
Indicatief topicbudget, naar verwachting 2 projecten.
Indicative topic budget, 2 projects expected to be funded.
Note on the maximum: ChangedShowHide
Geen bindend maximum; de Commissie acht circa € 8,5 mln EU-bijdrage per project passend (lump sum).
No binding maximum; the Commission considers an EU contribution of around €8.5 million per project appropriate (lump sum).
Cumulation: ChangedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared under two different EU actions (General Annex G).
Search engine description: ChangedShowHide
Horizon Europe-innovatieactie (lump sum, circa € 8,5 mln per project) voor de demonstratie van waterkrachttechnologie bij renovatie.
Horizon Europe innovation action (lump sum, around €8.5 million per project) for demonstrating hydropower technology in plant refurbishment.
Procedure: ChangedShowHide
Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).
Applications via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Notes per cost type: ChangedShowHide
Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording. Financieringspercentage 70%; 100% voor non-profitorganisaties (General Annex G).
Other costs: Lump sum: fixed contribution per work package, no cost reporting. Funding rate 70%; 100% for non-profit organisations (General Annex G).
Why this scheme: ChangedShowHide
Bestaande waterkracht flexibeler en duurzamer inzetten in een hernieuwbaar elektriciteitssysteem.
To use existing hydropower more flexibly and sustainably in a renewable electricity system.
In brief: ChangedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke juridische entiteiten uit drie verschillende landen, waarvan minstens één uit een EU-lidstaat en de andere uit EU-lidstaten of met Horizon Europe geassocieerde landen. Entiteiten uit China, of in een subsidiabel land maar onder zeggenschap van China, mogen niet deelnemen.
What for: Demonstratie van waterkrachttechnologieën voor een efficiënte en toekomstgerichte renovatie van bestaande waterkrachtcentrales, zodat bestaande waterkracht flexibeler en duurzamer kan bijdragen aan een hernieuwbaar elektriciteitssysteem. De activiteiten moeten aan het eind van het project TRL 6-7 bereiken.
What you get: Een lump-sum-subsidie van 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van ongeveer € 8,5 miljoen per project passend. Het indicatieve budget voor het topic is € 17 miljoen.
What you need to do: Dien van 4 augustus 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent legal entities from three different countries, at least one of which is established in an EU Member State and the others in EU Member States or Horizon Europe Associated Countries. Entities from China, or established in an eligible country but controlled by China, may not participate.
What for: Demonstration of hydropower technologies for the efficient and forward-looking refurbishment of existing hydropower plants, so that existing hydropower can contribute more flexibly and sustainably to a renewable electricity system. Activities must reach TRL 6-7 by the end of the project.
What you get: A lump sum grant covering 70% of eligible costs (up to 100% for non-profit organisations); the Commission considers an EU contribution of around €8.5 million per project appropriate. The indicative topic budget is €17 million.
What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal between 4 August 2027 and 1 December 2027 (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.
Goals: 3 removed, 3 newShowHide
Bijdrage aan een stabiel elektriciteitssysteem Meer capaciteit van het waterkrachtpark om samen met variabele hernieuwbare bronnen bij te dragen aan een veilig en stabiel elektriciteitssysteem, onder meer door modernisering van netintegratie en aansturing.
Sterkere Europese waterkrachtindustrie Meer technologisch leiderschap, concurrentievermogen en exportpotentieel van de Europese waterkrachtindustrie.
Klimaatbestendige waterkracht Aanpak van klimaatadaptatie voor een toekomstgerichte en stabiele exploitatie van duurzame waterkracht in de komende decennia.
Contribution to a stable electricity system Increased capacity of the hydropower fleet to contribute, together with variable renewable sources, to a secure and stable electricity system, including through modernisation of grid integration and control.
Stronger European hydropower industry Greater technological leadership, competitiveness and export potential of the European hydropower industry.
Climate-resilient hydropower Addressing climate adaptation for the forward-looking and stable operation of sustainable hydropower in the coming decades.
Show 4 earlier versionsShow less
19 October 2026scheme · version 4
Conditions: 2 removed, 6 newShowHide
Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).
Geen deelname van entiteiten onder Chinese controle Entiteiten die direct of indirect worden gecontroleerd door China of een in China gevestigde entiteit mogen niet deelnemen (restrictie voor innovatieacties in kritieke technologiegebieden, General Annex B).
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
In brief: AddedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke juridische entiteiten uit drie verschillende landen, waarvan minstens één uit een EU-lidstaat en de andere uit EU-lidstaten of met Horizon Europe geassocieerde landen. Entiteiten uit China, of in een subsidiabel land maar onder zeggenschap van China, mogen niet deelnemen.
What for: Demonstratie van waterkrachttechnologieën voor een efficiënte en toekomstgerichte renovatie van bestaande waterkrachtcentrales, zodat bestaande waterkracht flexibeler en duurzamer kan bijdragen aan een hernieuwbaar elektriciteitssysteem. De activiteiten moeten aan het eind van het project TRL 6-7 bereiken.
What you get: Een lump-sum-subsidie van 70% van de subsidiabele kosten (tot 100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van ongeveer € 8,5 miljoen per project passend. Het indicatieve budget voor het topic is € 17 miljoen.
What you need to do: Dien van 4 augustus 2027 tot uiterlijk 1 december 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
18 October 2026scheme · version 3
About the scheme: AddedShowHide
For a renewables-based electricity system sufficient flexible and also in the long-run fully sustainable hydropower capacity is pivotal. Project results are expected to contribute to all of the following expected outcomes: - Enhancing the capacities of the hydropower fleet to contribute with variable renewables base load to a secure and stable electricity system, including by modernising grid integration and hydropower fleet control. - Increase technology leadership, competitiveness and technology export potential of European hydropower industry. - Address challenges of climate change adaptation for a forward-looking and stable operation of sustainable hydropower for the coming decades.
16 October 2026scheme · version 2
Cycle: AddedShowHide
Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).
Cumulation: AddedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
Goals: 3 newShowHide
Bijdrage aan een stabiel elektriciteitssysteem Meer capaciteit van het waterkrachtpark om samen met variabele hernieuwbare bronnen bij te dragen aan een veilig en stabiel elektriciteitssysteem, onder meer door modernisering van netintegratie en aansturing.
Sterkere Europese waterkrachtindustrie Meer technologisch leiderschap, concurrentievermogen en exportpotentieel van de Europese waterkrachtindustrie.
Klimaatbestendige waterkracht Aanpak van klimaatadaptatie voor een toekomstgerichte en stabiele exploitatie van duurzame waterkracht in de komende decennia.
8 October 2026scheme · version 1 · first publication
Contact & source
Start your HORIZON-CL5-2027-07-D3-11 application
in Twin.