Skip to content
Opening soonHORIZON-CL5-2027-05-D4-07CINEAOne-off

Integrating circularity in LCA-based modelling frameworks for renovation of buildings (Built4People Partnership)

Integrating circularity into life cycle assessment for building renovation.

Horizon Europe Innovation Action (IA) (around €6.75 million per project) for a modelling framework that integrates circularity into life cycle assessment (LCA) of building renovations, tested on at least three real-life buildings (Built4People). Ends at TRL 6-8.

Opening soon
168
days until opening
Opens on 5 May 2027
HORIZON-CL5-2027-05-D4-07
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Integrating circularity in LCA-based modelling frameworks for renovation of buildings (Built4People Partnership)?

Who
Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is from an EU Member State. Entities established in China cannot participate.
General Annex B (Entities eligible to participate; Entities eligible for funding; Consortium composition); Destination introduction
What for
A modelling framework that integrates circularity into life cycle assessments (LCA) of building renovations, tested on at least three real-life buildings. Projects reach TRL 6-8 by the end.
Expected Outcome; Scope; Technology Readiness Level
What you get
A lump sum grant with a funding rate of up to 70% (non-profit organisations up to 100%); the Commission considers an EU contribution of around €6.75 million per project appropriate. The indicative budget for the topic is €27 million.
Specific conditions (Expected EU contribution per project, Indicative budget, Legal and financial set-up of the Grant Agreements); General Annex G (Funding rates)
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 15 September 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Planned opening; Deadline(s); General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

The project improves the substantiation of circularity in life cycle assessments of building renovations.

01
Demonstrably less material, energy and emissions
Demonstration of measurable reductions in material flows, life cycle energy use and greenhouse gas emissions in renovations using circular strategies, contributing to buildings with net-zero CO2 emissions over the whole life cycle.
02
More robust modelling frameworks
A more robust approach to existing modelling frameworks, so that building-level life cycle assessments fully capture the complexity of circular strategies.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Project results are expected to contribute to all of the following expected outcomes: - Demonstration of measurable reductions in material flows, life cycle energy use and GHG emissions in building renovations that integrate circularity strategies to contribute to achieving net-zero whole life carbon buildings; - More robust approach to current modelling frameworks to comprehensively reflect the complexity of circularity strategies in life cycle assessments at building scale.

Read more

European buildings are increasingly adopting circularity strategies in renovations to reduce life cycle environmental impacts and improve resource efficiency in response to the requirements based on current frameworks, such as Level(s) and WLC models used by Member States based and EN 15978 standard.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
02
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
03
Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
04
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
05
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieBouw, vastgoed en ruimtelijke ontwikkelingCirculaire economie, grondstoffen en afval
Project phase
DevelopmentDemonstration
Funding

What do you get?

70% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €6.75 million per project appropriate.
€27m · Indicative topic budget, 4 projects expected.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

5
MAY
HORIZON-CL5-2027-05-D4-07 opens 5 May 2027
Planned opening; Deadline(s)
Cycle: Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative data of the participants and summarised budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 45 pages for a lump sum IA)
  • Detailed budget table (HE LS template in the submission system)
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Not eligible
Materials
Not eligible
Subcontracting
Not eligible
Equipment
Not eligible
Land
Not eligible
Buildings
Not eligible
Overheads
Not eligible
Travel costs
Not eligible
Other costs
Lump sum: fixed contribution per work package, no cost reporting; funding rate 70% (non-profit organisations 100%) (General Annex G).
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Integratie van circulariteit in levenscyclusanalyse voor gebouwrenovatie.

Now

Integrating circularity into life cycle assessment for building renovation.

Description
Description: ChangedShow
Before

Het project toont meetbare verminderingen van materiaalstromen, levenscyclusenergie en broeikasgasemissies bij gebouwrenovaties met circulariteitsstrategieën, gericht op netto-nul levenscyclus-CO2. Het ontwikkelt een modelleringskader dat circulariteit integreert in levenscyclusanalyse (cradle-to-cradle) en past dit toe op minstens drie praktijkgebouwen in verschillende klimaatregio's en lidstaten, met strategieën als hergebruik, recycling, reparatie of refurbishment.

Now

The project demonstrates measurable reductions in material flows, life cycle energy and greenhouse gas emissions in building renovations using circularity strategies, aiming at net-zero life cycle CO2. It develops a modelling framework that integrates circularity into life cycle assessment (cradle-to-cradle) and applies it to at least three real-life buildings in different climate regions and Member States, with strategies such as reuse, recycling, repair or refurbishment.

Short description
Short description: ChangedShow
Before

Horizon Europe-innovatieactie (IA) (circa € 6,75 mln per project) voor een modelleringskader dat circulariteit integreert in levenscyclusanalyse (LCA) van gebouwrenovaties, getoetst aan minstens drie praktijkgebouwen (Built4People). Eindigt op TRL 6-8.

Now

Horizon Europe Innovation Action (IA) (around €6.75 million per project) for a modelling framework that integrates circularity into life cycle assessment (LCA) of building renovations, tested on at least three real-life buildings (Built4People). Ends at TRL 6-8.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Now

Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 4 projecten.

Now

Indicative topic budget, 4 projects expected.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 6,75 mln EU-bijdrage per project passend.

Now

No binding maximum; the Commission considers an EU contribution of around €6.75 million per project appropriate.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
Circulariteit in LCA gebouwrenovatie (Horizon CL5) becomes Circularity in LCA for building renovation (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-IA voor circulariteit in LCA-modellering van gebouwrenovatie (Built4People), circa € 6,75 mln per project, TRL 6-8.

Now

Horizon Europe IA for circularity in LCA modelling of building renovation (Built4People), around €6.75 million per project, TRL 6-8.

Keywords
circulair renoveren, circulariteit, Cluster 5 Climate, Energy and Mobility, CO2-uitstoot van gebouwen, Horizon Europe, HORIZON-CL5-2027-05-D4-07, levenscyclusanalyse becomes building CO2 emissions, circular renovation, circularity, Cluster 5 Climate, Energy and Mobility, Horizon Europe, HORIZON-CL5-2027-05-D4-07, life cycle assessment
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 45 pagina's voor een lump-sum IA); Gedetailleerde begrotingstabel (sjabloon HE LS in het indieningssysteem) becomes Application form Part A: administrative data of the participants and summarised budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 45 pages for a lump sum IA); Detailed budget table (HE LS template in the submission system)
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording; financieringspercentage 70% (non-profitorganisaties 100%) (General Annex G).

Now

Other costs: Lump sum: fixed contribution per work package, no cost reporting; funding rate 70% (non-profit organisations 100%) (General Annex G).

Why this scheme
Why this scheme: ChangedShow
Before

Het project verbetert de onderbouwing van circulariteit in levenscyclusanalyses van gebouwrenovaties.

Now

The project improves the substantiation of circularity in life cycle assessments of building renovations.

In brief
In brief: ChangedShow
Before

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. In China gevestigde entiteiten kunnen niet deelnemen.

What for: Een modelleringskader dat circulariteit integreert in levenscyclusanalyses (LCA) van gebouwrenovaties, getoetst aan ten minste drie praktijkgebouwen. Projecten bereiken aan het eind TRL 6-8.

What you get: Een subsidie in de vorm van een lump sum met een financieringspercentage van maximaal 70% (non-profitorganisaties tot 100%); de Commissie acht een EU-bijdrage van ongeveer € 6,75 miljoen per project passend. Het indicatieve budget voor het topic is € 27 miljoen.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is from an EU Member State. Entities established in China cannot participate.

What for: A modelling framework that integrates circularity into life cycle assessments (LCA) of building renovations, tested on at least three real-life buildings. Projects reach TRL 6-8 by the end.

What you get: A lump sum grant with a funding rate of up to 70% (non-profit organisations up to 100%); the Commission considers an EU contribution of around €6.75 million per project appropriate. The indicative budget for the topic is €27 million.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 15 September 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.

Goals
Goals: 2 removed, 2 newShow
Removed

Aantoonbaar minder materiaal, energie en uitstoot Demonstratie van meetbare verminderingen van materiaalstromen, energiegebruik over de levenscyclus en broeikasgasuitstoot bij renovaties met circulaire strategieën, als bijdrage aan gebouwen met netto nul CO2-uitstoot over de hele levenscyclus.

Robuustere modelleringskaders Een robuustere aanpak van bestaande modelleringskaders, zodat levenscyclusanalyses op gebouwniveau de complexiteit van circulaire strategieën volledig weergeven.

New

Demonstrably less material, energy and emissions Demonstration of measurable reductions in material flows, life cycle energy use and greenhouse gas emissions in renovations using circular strategies, contributing to buildings with net-zero CO2 emissions over the whole life cycle.

More robust modelling frameworks A more robust approach to existing modelling frameworks, so that building-level life cycle assessments fully capture the complexity of circular strategies.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 1 removed, 5 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

New

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

In brief
In brief: AddedShow
Now

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. In China gevestigde entiteiten kunnen niet deelnemen.

What for: Een modelleringskader dat circulariteit integreert in levenscyclusanalyses (LCA) van gebouwrenovaties, getoetst aan ten minste drie praktijkgebouwen. Projecten bereiken aan het eind TRL 6-8.

What you get: Een subsidie in de vorm van een lump sum met een financieringspercentage van maximaal 70% (non-profitorganisaties tot 100%); de Commissie acht een EU-bijdrage van ongeveer € 6,75 miljoen per project passend. Het indicatieve budget voor het topic is € 27 miljoen.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Project results are expected to contribute to all of the following expected outcomes: - Demonstration of measurable reductions in material flows, life cycle energy use and GHG emissions in building renovations that integrate circularity strategies to contribute to achieving net-zero whole life carbon buildings; - More robust approach to current modelling frameworks to comprehensively reflect the complexity of circularity strategies in life cycle assessments at building scale. European buildings are increasingly adopting circularity strategies in renovations to reduce life cycle environmental impacts and improve resource efficiency in response to the requirements based on current frameworks, such as Level(s) and WLC models used by Member States based and EN 15978 standard.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: circulair renoveren, circulariteit, Cluster 5 Climate, Energy and Mobility, CO2-uitstoot van gebouwen, Horizon Europe, HORIZON-CL5-2027-05-D4-07, levenscyclusanalyse
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 45 pagina's voor een lump-sum IA); Gedetailleerde begrotingstabel (sjabloon HE LS in het indieningssysteem)
Goals
Goals: 2 newShow
New

Aantoonbaar minder materiaal, energie en uitstoot Demonstratie van meetbare verminderingen van materiaalstromen, energiegebruik over de levenscyclus en broeikasgasuitstoot bij renovaties met circulaire strategieën, als bijdrage aan gebouwen met netto nul CO2-uitstoot over de hele levenscyclus.

Robuustere modelleringskaders Een robuustere aanpak van bestaande modelleringskaders, zodat levenscyclusanalyses op gebouwniveau de complexiteit van circulaire strategieën volledig weergeven.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
18 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2027-05-D4-07 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.