Skip to content
Opening soonHORIZON-CL5-2027-05-D3-31CINEAOne-off

Support to the implementation of an EU policy framework for CO2 transport and storage infrastructure

Support for stakeholders in implementing the EU policy framework for CO2 transport and storage infrastructure.

Horizon Europe coordination and support action (CSA) (around €5 million per project) to support stakeholders in the CO2 infrastructure chain in implementing the upcoming EU legislative framework for CO2 transport and storage.

Opening soon
168
days until opening
Opens on 5 May 2027
HORIZON-CL5-2027-05-D3-31
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Support to the implementation of an EU policy framework for CO2 transport and storage infrastructure?

Who
Companies of any size, research organisations, public authorities, foundations and associations from EU Member States or Associated Countries; a single applicant is sufficient.
General Annex B (Entities eligible to participate; Entities eligible for funding, Coordination and Support Actions; Consortium composition)
What for
Support for stakeholders in the CO2 infrastructure chain in implementing the EU policy framework for CO2 transport and storage.
Expected Outcome; Scope
What you get
A lump sum grant with a funding rate of 100%; the Commission considers an EU contribution of around €5 million per project appropriate. The indicative budget for the topic is €5 million.
Specific conditions (Expected EU contribution per project, Indicative budget, Legal and financial set-up of the Grant Agreements); General Annex G (Funding rates)
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 15 September 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Planned opening; Deadline(s); General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

The project helps support the implementation of the EU policy framework for CO2 infrastructure.

01
Ready for the new legal framework
Parties in the CO2 infrastructure network are able to apply the upcoming legal framework for CO2 infrastructure.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Project results are expected to contribute to the following outcome: - Stakeholders involved in the CO2 infrastructure network are in a position to implement the upcoming legislative framework for CO2 infrastructure.

Read more

The project is expected to assist stakeholders involved in the CO2 infrastructure network in implementing the upcoming legislative framework for CO2 infrastructure.

Issues to address include market and cost structure, cross-border integration, interoperability and planning, technical harmonisation and investment incentives for new infrastructure, third-party access, along-chain liability, competent regulatory authorities, tariff regulation, ownership and contractual models, baseline of the state of play of current legislation on various aspects of the value chain.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible to participate as beneficiaries (or affiliated entities) in ‘Coordination and support’ actions, legal entities must be established in a Member State or Associated Country, unless the specific call/topic conditions provide otherwise (in which case the general rules for eligibility for funding apply).
02
Applications for ‘Coordination and support’ actions may be submitted by one or more legal entities, which may be established in a Member State, Associated Country or, in exceptional cases and if provided for in the specific call/topic conditions, in another third country.
03
Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
04
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieOverheid, bestuur en publieke dienstverleningEnergie, klimaat en verduurzaming
Funding

What do you get?

100% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €5 million per project appropriate.
€5m · Indicative topic budget, 1 project expected to be funded.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

5
MAY
HORIZON-CL5-2027-05-D3-31 opens 5 May 2027
Planned opening; Deadline(s)
Cycle: Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative details of the participants and summary budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 28 pages for a lump sum CSA)
  • Detailed budget table (HE LS template in the submission system)
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Not eligible
Materials
Not eligible
Subcontracting
Not eligible
Equipment
Not eligible
Land
Not eligible
Buildings
Not eligible
Overheads
Not eligible
Travel costs
Not eligible
Other costs
Lump sum: fixed contribution per work package, no cost reporting; funding rate 100% (General Annex G).
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Ondersteuning van belanghebbenden bij de uitvoering van het EU-beleidskader voor CO2-transport- en opslaginfrastructuur.

Now

Support for stakeholders in implementing the EU policy framework for CO2 transport and storage infrastructure.

Description
Description: ChangedShow
Before

Het project ondersteunt belanghebbenden in de CO2-infrastructuurketen bij de uitvoering van het komende EU-wetgevingskader voor CO2-transport en -opslag. Onderwerpen zijn onder meer markt- en koststructuur, grensoverschrijdende integratie, interoperabiliteit, harmonisatie, investeringsprikkels, toegang voor derden en eigendomsmodellen. Het brengt ook de stand van zaken rond hergebruik van bestaande CO2-infrastructuur in kaart, inclusief de behoeften van hernieuwbare gassen.

Now

The project supports stakeholders in the CO2 infrastructure chain in implementing the upcoming EU legislative framework for CO2 transport and storage. Topics include market and cost structure, cross-border integration, interoperability, harmonisation, investment incentives, third-party access and ownership models. It also maps the state of play on the reuse of existing CO2 infrastructure, including the needs of renewable gases.

Short description
Short description: ChangedShow
Before

Horizon Europe-coördinatie- en ondersteuningsactie (CSA) (circa € 5 mln per project) voor ondersteuning van belanghebbenden in de CO2-infrastructuurketen bij de uitvoering van het komende EU-wetgevingskader voor CO2-transport en -opslag.

Now

Horizon Europe coordination and support action (CSA) (around €5 million per project) to support stakeholders in the CO2 infrastructure chain in implementing the upcoming EU legislative framework for CO2 transport and storage.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Now

Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 1 project.

Now

Indicative topic budget, 1 project expected to be funded.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 5 mln EU-bijdrage per project passend.

Now

No binding maximum; the Commission considers an EU contribution of around €5 million per project appropriate.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
EU-beleidskader CO2-infrastructuur (Horizon CL5) becomes EU policy framework for CO2 infrastructure (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-CSA voor ondersteuning van de uitvoering van het EU-beleidskader voor CO2-transport- en opslaginfrastructuur, circa € 5 mln per project.

Now

Horizon Europe CSA to support implementation of the EU policy framework for CO2 transport and storage infrastructure, around €5 million per project.

Keywords
Cluster 5 Climate, Energy and Mobility, CO2-infrastructuur, CO2-opslag, CO2-transport, EU-regelgeving, Horizon Europe, HORIZON-CL5-2027-05-D3-31 becomes Cluster 5 Climate, Energy and Mobility, CO2 infrastructure, CO2 storage, CO2 transport, EU regulation, Horizon Europe, HORIZON-CL5-2027-05-D3-31
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 28 pagina's voor een lump-sum CSA); Gedetailleerde begrotingstabel (sjabloon HE LS in het indieningssysteem) becomes Application form Part A: administrative details of the participants and summary budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 28 pages for a lump sum CSA); Detailed budget table (HE LS template in the submission system)
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording; financieringspercentage 100% (General Annex G).

Now

Other costs: Lump sum: fixed contribution per work package, no cost reporting; funding rate 100% (General Annex G).

Why this scheme
Why this scheme: ChangedShow
Before

Het project helpt de uitvoering van het EU-beleidskader voor CO2-infrastructuur te ondersteunen.

Now

The project helps support the implementation of the EU policy framework for CO2 infrastructure.

In brief
In brief: ChangedShow
Before

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen uit EU-lidstaten of geassocieerde landen; één aanvrager volstaat.

What for: Ondersteuning van belanghebbenden in de CO2-infrastructuurketen bij de uitvoering van het EU-beleidskader voor CO2-transport en -opslag.

What you get: Een subsidie in de vorm van een lump sum met een financieringspercentage van 100%; de Commissie acht een EU-bijdrage van ongeveer € 5 miljoen per project passend. Het indicatieve budget voor het topic is € 5 miljoen.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: Companies of any size, research organisations, public authorities, foundations and associations from EU Member States or Associated Countries; a single applicant is sufficient.

What for: Support for stakeholders in the CO2 infrastructure chain in implementing the EU policy framework for CO2 transport and storage.

What you get: A lump sum grant with a funding rate of 100%; the Commission considers an EU contribution of around €5 million per project appropriate. The indicative budget for the topic is €5 million.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 5 May 2027 until 15 September 2027 at the latest (17:00 Brussels time), with application form Part A and Part B and a detailed budget table. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.

Goals
Goals: 1 removed, 1 newShow
Removed

Klaar voor het nieuwe wettelijke kader Partijen in het CO2-infrastructuurnetwerk zijn in staat het komende wettelijke kader voor CO2-infrastructuur toe te passen.

New

Ready for the new legal framework Parties in the CO2 infrastructure network are able to apply the upcoming legal framework for CO2 infrastructure.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 1 removed, 4 newShow
Removed

Geen verplicht minimumaantal partners Als coördinatie- en ondersteuningsactie (CSA) is een aanvraag door één juridische entiteit toegestaan, tenzij de topic iets anders bepaalt (General Annex B).

New

To be eligible to participate as beneficiaries (or affiliated entities) in ‘Coordination and support’ actions, legal entities must be established in a Member State or Associated Country, unless the specific call/topic conditions provide otherwise (in which case the general rules for eligibility for funding apply).

Applications for ‘Coordination and support’ actions may be submitted by one or more legal entities, which may be established in a Member State, Associated Country or, in exceptional cases and if provided for in the specific call/topic conditions, in another third country.

Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

In brief
In brief: AddedShow
Now

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen uit EU-lidstaten of geassocieerde landen; één aanvrager volstaat.

What for: Ondersteuning van belanghebbenden in de CO2-infrastructuurketen bij de uitvoering van het EU-beleidskader voor CO2-transport en -opslag.

What you get: Een subsidie in de vorm van een lump sum met een financieringspercentage van 100%; de Commissie acht een EU-bijdrage van ongeveer € 5 miljoen per project passend. Het indicatieve budget voor het topic is € 5 miljoen.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Project results are expected to contribute to the following outcome: - Stakeholders involved in the CO2 infrastructure network are in a position to implement the upcoming legislative framework for CO2 infrastructure. The project is expected to assist stakeholders involved in the CO2 infrastructure network in implementing the upcoming legislative framework for CO2 infrastructure. Issues to address include market and cost structure, cross-border integration, interoperability and planning, technical harmonisation and investment incentives for new infrastructure, third-party access, along-chain liability, competent regulatory authorities, tariff regulation, ownership and contractual models, baseline of the state of play of current legislation on various aspects of the value chain.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: Cluster 5 Climate, Energy and Mobility, CO2-infrastructuur, CO2-opslag, CO2-transport, EU-regelgeving, Horizon Europe, HORIZON-CL5-2027-05-D3-31
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 28 pagina's voor een lump-sum CSA); Gedetailleerde begrotingstabel (sjabloon HE LS in het indieningssysteem)
Goals
Goals: 1 newShow
New

Klaar voor het nieuwe wettelijke kader Partijen in het CO2-infrastructuurnetwerk zijn in staat het komende wettelijke kader voor CO2-infrastructuur toe te passen.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
17 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2027-05-D3-31 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.