Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership)
System demonstrations of long-duration battery storage for a more stable European electricity grid.
Horizon Europe Innovation Action (around €9.4 million per project) for system demonstrations of not-yet-commercialised long-duration battery storage technologies (>8 hours) with scalable materials low in critical raw materials, to strengthen grid stability. Ends at TRL 6-7.
This grant database is in beta
Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.
What is Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership)?
Built from the details on this page, with nothing added by us.
Why does this scheme exist?
The topic demonstrates long-duration battery storage technology that strengthens the stability and flexibility of the European electricity grid.
About the scheme
Compiled from passages of the scheme's official publication, with nothing added by us.
Projects are expected to contribute to all of the following outcomes: - Demonstrated system-level long-duration energy storage (LDES) solutions, explicitly aimed at enhancing grid stability, resilience, and flexibility in Europe. - Substantial reduction of Europe's dependence on critical raw materials through the use of abundant, low-cost, and sustainable materials. - Contribute to strategic insights for a coherent EU-wide stationary storage deployment strategy, enhancing European energy autonomy and sustainability. - Sufficient and reproducible operational data and insights to serve as reliable input towards detailed technoeconomic analyses.
Conditions
Quoted verbatim from the scheme, with the article that sets each condition.
What do you get?
70% of your eligible project costs.
Deadlines & cycles
How do you apply?
- Application form Part A: administrative details of the participants and summarised budget (to be completed online)
- Application form Part B: technical description of the project (PDF, maximum 40 pages for an IA)
What can the money be spent on?
Files & forms
What has changed?
10 November 2026scheme · version 5
Subtitle: ChangedShowHide
Systeemdemonstraties van langdurige batterijopslag voor een stabieler Europees elektriciteitsnet.
System demonstrations of long-duration battery storage for a more stable European electricity grid.
Description: ChangedShowHide
Het project demonstreert op systeemniveau innovatieve langeduuropslagtechnologieën voor batterijen (>8 uur), zoals redoxflowbatterijen, hogetemperatuursystemen of metaal-luchtsystemen, voor grootschalige energiesystemen of industriële afnemers. Het bepaalt gebruiksscenario's, onderzoekt hybridisatie met complementaire opslagtechnologieën, zet in op schaalbare, grondstofarme materialen, integreert digitaal batterij- en energiebeheer, en onderbouwt de haalbaarheid en veiligheid.
The project demonstrates at system level innovative long-duration battery storage technologies (>8 hours), such as redox flow batteries, high-temperature systems or metal-air systems, for large-scale energy systems or industrial customers. It defines use cases, explores hybridisation with complementary storage technologies, focuses on scalable materials with low raw material use, integrates digital battery and energy management, and substantiates feasibility and safety.
Short description: ChangedShowHide
Horizon Europe-innovatieactie (circa € 9,4 mln per project) voor systeemdemonstraties van nog niet-gecommercialiseerde langeduuropslagtechnologieën (>8 uur) voor batterijen, met schaalbare, kritieke-grondstofarme materialen, ter versterking van netstabiliteit. Eindigt op TRL 6-7.
Horizon Europe Innovation Action (around €9.4 million per project) for system demonstrations of not-yet-commercialised long-duration battery storage technologies (>8 hours) with scalable materials low in critical raw materials, to strengthen grid stability. Ends at TRL 6-7.
Cycle: ChangedShowHide
Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).
Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F).
Note on the total budget: ChangedShowHide
Indicatief topicbudget, naar verwachting 2 projecten.
Indicative topic budget; 2 projects expected.
Note on the maximum: ChangedShowHide
Geen bindend maximum; de Commissie acht circa € 9,4 mln EU-bijdrage per project passend.
No binding maximum; the Commission considers an EU contribution of around €9.4 million per project appropriate.
Cumulation: ChangedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Search engine description: ChangedShowHide
Horizon Europe-innovatieactie voor systeemdemonstraties van langdurige batterijopslag (>8 uur) die netstabiliteit versterkt; circa € 9,4 mln per project.
Horizon Europe Innovation Action: system demonstrations of long-duration battery storage (>8 hours) for grid stability; around €9.4 million per project.
Procedure: ChangedShowHide
Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Notes per cost type: ChangedShowHide
Overheads: Indirecte kosten als forfaitair percentage van 25% van de directe kosten volgens de modelsubsidieovereenkomst.
Personnel costs: Werkelijke kosten volgens de modelsubsidieovereenkomst van Horizon Europe; financieringspercentage 70% (non-profitorganisaties 100%) (General Annex G).
Overheads: Indirect costs as a flat rate of 25% of direct costs in accordance with the model grant agreement.
Personnel costs: Actual costs in accordance with the Horizon Europe model grant agreement; funding rate 70% (non-profit organisations 100%) (General Annex G).
Why this scheme: ChangedShowHide
Het topic demonstreert langdurige batterijopslagtechnologie die de stabiliteit en flexibiliteit van het Europese elektriciteitsnet versterkt.
The topic demonstrates long-duration battery storage technology that strengthens the stability and flexibility of the European electricity grid.
In brief: ChangedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. In China gevestigde entiteiten en entiteiten die direct of indirect door China worden gecontroleerd, kunnen niet deelnemen.
What for: Systeemdemonstraties van innovatieve batterijopslag voor lange duur (meer dan 8 uur) die nog niet op de markt is, om de stabiliteit en flexibiliteit van het Europese elektriciteitsnet te versterken. Projecten bereiken aan het eind TRL 6-7.
What you get: Een subsidie met een financieringspercentage van maximaal 70% (non-profitorganisaties tot 100%); de Commissie acht een EU-bijdrage van ongeveer € 9,4 miljoen per project passend. Het indicatieve budget voor het topic is € 18,8 miljoen.
What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is from an EU Member State. Entities established in China and entities directly or indirectly controlled by China cannot participate.
What for: System demonstrations of innovative long-duration battery storage (more than 8 hours) that is not yet on the market, to strengthen the stability and flexibility of the European electricity grid. Projects reach TRL 6-7 by the end.
What you get: A grant with a funding rate of up to 70% (non-profit organisations up to 100%); the Commission considers an EU contribution of approximately €9.4 million per project appropriate. The indicative budget for the topic is €18.8 million.
What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal between 5 May 2027 and 15 September 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.
Goals: 4 removed, 4 newShowHide
Gedemonstreerde langdurige opslag Gedemonstreerde oplossingen voor langdurige energieopslag (LDES) op systeemniveau, gericht op meer stabiliteit, veerkracht en flexibiliteit van het Europese elektriciteitsnet.
Minder kritieke grondstoffen Een flinke vermindering van de Europese afhankelijkheid van kritieke grondstoffen door het gebruik van ruim beschikbare, goedkope en duurzame materialen.
Bouwstenen voor een EU-opslagstrategie Strategische inzichten voor een samenhangende EU-brede strategie voor stationaire opslag, die de Europese energieautonomie en duurzaamheid versterkt.
Betrouwbare operationele data Voldoende en reproduceerbare operationele data en inzichten als betrouwbare basis voor gedetailleerde techno-economische analyses.
Demonstrated long-duration storage Demonstrated long-duration energy storage (LDES) solutions at system level, aimed at greater stability, resilience and flexibility of the European electricity grid.
Fewer critical raw materials A significant reduction in Europe's dependence on critical raw materials through the use of abundant, low-cost and sustainable materials.
Building blocks for an EU storage strategy Strategic insights for a coherent EU-wide strategy for stationary storage that strengthens European energy autonomy and sustainability.
Reliable operational data Sufficient and reproducible operational data and insights as a reliable basis for detailed techno-economic analyses.
Show 4 earlier versionsShow less
19 October 2026scheme · version 4
Conditions: 4 removed, 6 newShowHide
Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).
Uitsluiting van door China gecontroleerde entiteiten Entiteiten die direct of indirect worden gecontroleerd door China of een in China gevestigde juridische entiteit zijn niet deelnamegerechtigd (General Annex B, beperking op zeggenschap bij innovatieacties in kritieke technologiegebieden).
Deelname Joint Research Centre Het JRC mag deelnemen als begunstigde zonder financiering of als geassocieerde partner, maar niet bij de voorbereiding en indiening van het voorstel (General Annex B).
Beperking op overdracht van eigendom van resultaten De subsidieverlenende autoriteit kan tot 4 jaar na afloop van de actie bezwaar maken tegen overdracht van eigendom of exclusieve licentiëring van resultaten (specifieke bepaling van Annex 5, General Annex G).
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
In brief: AddedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. In China gevestigde entiteiten en entiteiten die direct of indirect door China worden gecontroleerd, kunnen niet deelnemen.
What for: Systeemdemonstraties van innovatieve batterijopslag voor lange duur (meer dan 8 uur) die nog niet op de markt is, om de stabiliteit en flexibiliteit van het Europese elektriciteitsnet te versterken. Projecten bereiken aan het eind TRL 6-7.
What you get: Een subsidie met een financieringspercentage van maximaal 70% (non-profitorganisaties tot 100%); de Commissie acht een EU-bijdrage van ongeveer € 9,4 miljoen per project passend. Het indicatieve budget voor het topic is € 18,8 miljoen.
What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
18 October 2026scheme · version 3
About the scheme: AddedShowHide
Projects are expected to contribute to all of the following outcomes: - Demonstrated system-level long-duration energy storage (LDES) solutions, explicitly aimed at enhancing grid stability, resilience, and flexibility in Europe. - Substantial reduction of Europe's dependence on critical raw materials through the use of abundant, low-cost, and sustainable materials. - Contribute to strategic insights for a coherent EU-wide stationary storage deployment strategy, enhancing European energy autonomy and sustainability. - Sufficient and reproducible operational data and insights to serve as reliable input towards detailed technoeconomic analyses.
16 October 2026scheme · version 2
Cycle: AddedShowHide
Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).
Cumulation: AddedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
Goals: 4 newShowHide
Gedemonstreerde langdurige opslag Gedemonstreerde oplossingen voor langdurige energieopslag (LDES) op systeemniveau, gericht op meer stabiliteit, veerkracht en flexibiliteit van het Europese elektriciteitsnet.
Minder kritieke grondstoffen Een flinke vermindering van de Europese afhankelijkheid van kritieke grondstoffen door het gebruik van ruim beschikbare, goedkope en duurzame materialen.
Bouwstenen voor een EU-opslagstrategie Strategische inzichten voor een samenhangende EU-brede strategie voor stationaire opslag, die de Europese energieautonomie en duurzaamheid versterkt.
Betrouwbare operationele data Voldoende en reproduceerbare operationele data en inzichten als betrouwbare basis voor gedetailleerde techno-economische analyses.
7 October 2026scheme · version 1 · first publication
Contact & source
Start your HORIZON-CL5-2027-05-D2-08 application
in Twin.
Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.