Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership)

System demonstrations of long-duration battery storage for a more stable European electricity grid.

Horizon Europe Innovation Action (around €9.4 million per project) for system demonstrations of not-yet-commercialised long-duration battery storage technologies (>8 hours) with scalable materials low in critical raw materials, to strengthen grid stability. Ends at TRL 6-7.

Opening soon
168
days until opening
Opens on 5 May 2027
HORIZON-CL5-2027-05-D2-08
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Demonstration for Long-duration Battery Energy Storage Systems (BATT4EU Partnership)?

Who
Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is from an EU Member State. Entities established in China and entities directly or indirectly controlled by China cannot participate.
General Annex B (Entities eligible to participate; Entities eligible for funding; Consortium composition); Destination introduction; Topic conditions, Other Eligible Conditions
What for
System demonstrations of innovative long-duration battery storage (more than 8 hours) that is not yet on the market, to strengthen the stability and flexibility of the European electricity grid. Projects reach TRL 6-7 by the end.
Expected Outcome; Scope; Technology Readiness Level
What you get
A grant with a funding rate of up to 70% (non-profit organisations up to 100%); the Commission considers an EU contribution of approximately €9.4 million per project appropriate. The indicative budget for the topic is €18.8 million.
Specific conditions (Expected EU contribution per project, Indicative budget); General Annex G (Funding rates)
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal between 5 May 2027 and 15 September 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.
Planned opening; Deadline(s); General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

The topic demonstrates long-duration battery storage technology that strengthens the stability and flexibility of the European electricity grid.

01
Demonstrated long-duration storage
Demonstrated long-duration energy storage (LDES) solutions at system level, aimed at greater stability, resilience and flexibility of the European electricity grid.
02
Fewer critical raw materials
A significant reduction in Europe's dependence on critical raw materials through the use of abundant, low-cost and sustainable materials.
03
Building blocks for an EU storage strategy
Strategic insights for a coherent EU-wide strategy for stationary storage that strengthens European energy autonomy and sustainability.
04
Reliable operational data
Sufficient and reproducible operational data and insights as a reliable basis for detailed techno-economic analyses.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Projects are expected to contribute to all of the following outcomes: - Demonstrated system-level long-duration energy storage (LDES) solutions, explicitly aimed at enhancing grid stability, resilience, and flexibility in Europe. - Substantial reduction of Europe's dependence on critical raw materials through the use of abundant, low-cost, and sustainable materials. - Contribute to strategic insights for a coherent EU-wide stationary storage deployment strategy, enhancing European energy autonomy and sustainability. - Sufficient and reproducible operational data and insights to serve as reliable input towards detailed technoeconomic analyses.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
02
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
03
Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
04
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
05
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
06
In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieCirculaire economie, grondstoffen en afvalEnergie, klimaat en verduurzaming
Project phase
DevelopmentDemonstration
Funding

What do you get?

70% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €9.4 million per project appropriate.
€18.8m · Indicative topic budget; 2 projects expected.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

5
MAY
HORIZON-CL5-2027-05-D2-08 opens 5 May 2027
Planned opening; Deadline(s)
Cycle: Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative details of the participants and summarised budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 40 pages for an IA)
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Actual costs in accordance with the Horizon Europe model grant agreement; funding rate 70% (non-profit organisations 100%) (General Annex G).
Materials
Not eligible
Subcontracting
Equipment
Land
Not eligible
Buildings
Not eligible
Overheads
Indirect costs as a flat rate of 25% of direct costs in accordance with the model grant agreement.
Travel costs
Other costs
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Systeemdemonstraties van langdurige batterijopslag voor een stabieler Europees elektriciteitsnet.

Now

System demonstrations of long-duration battery storage for a more stable European electricity grid.

Description
Description: ChangedShow
Before

Het project demonstreert op systeemniveau innovatieve langeduuropslagtechnologieën voor batterijen (>8 uur), zoals redoxflowbatterijen, hogetemperatuursystemen of metaal-luchtsystemen, voor grootschalige energiesystemen of industriële afnemers. Het bepaalt gebruiksscenario's, onderzoekt hybridisatie met complementaire opslagtechnologieën, zet in op schaalbare, grondstofarme materialen, integreert digitaal batterij- en energiebeheer, en onderbouwt de haalbaarheid en veiligheid.

Now

The project demonstrates at system level innovative long-duration battery storage technologies (>8 hours), such as redox flow batteries, high-temperature systems or metal-air systems, for large-scale energy systems or industrial customers. It defines use cases, explores hybridisation with complementary storage technologies, focuses on scalable materials with low raw material use, integrates digital battery and energy management, and substantiates feasibility and safety.

Short description
Short description: ChangedShow
Before

Horizon Europe-innovatieactie (circa € 9,4 mln per project) voor systeemdemonstraties van nog niet-gecommercialiseerde langeduuropslagtechnologieën (>8 uur) voor batterijen, met schaalbare, kritieke-grondstofarme materialen, ter versterking van netstabiliteit. Eindigt op TRL 6-7.

Now

Horizon Europe Innovation Action (around €9.4 million per project) for system demonstrations of not-yet-commercialised long-duration battery storage technologies (>8 hours) with scalable materials low in critical raw materials, to strengthen grid stability. Ends at TRL 6-7.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Now

Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 2 projecten.

Now

Indicative topic budget; 2 projects expected.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 9,4 mln EU-bijdrage per project passend.

Now

No binding maximum; the Commission considers an EU contribution of around €9.4 million per project appropriate.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
Langdurige batterijopslag (Horizon CL5) becomes Long-duration battery storage (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-innovatieactie voor systeemdemonstraties van langdurige batterijopslag (>8 uur) die netstabiliteit versterkt; circa € 9,4 mln per project.

Now

Horizon Europe Innovation Action: system demonstrations of long-duration battery storage (>8 hours) for grid stability; around €9.4 million per project.

Keywords
batterijopslag, Cluster 5 Climate, Energy and Mobility, Horizon Europe, HORIZON-CL5-2027-05-D2-08, kritieke grondstoffen, langdurige energieopslag, netstabiliteit becomes battery storage, Cluster 5 Climate, Energy and Mobility, critical raw materials, grid stability, Horizon Europe, HORIZON-CL5-2027-05-D2-08, long-duration energy storage
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 40 pagina's voor een IA) becomes Application form Part A: administrative details of the participants and summarised budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 40 pages for an IA)
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Overheads: Indirecte kosten als forfaitair percentage van 25% van de directe kosten volgens de modelsubsidieovereenkomst.

Personnel costs: Werkelijke kosten volgens de modelsubsidieovereenkomst van Horizon Europe; financieringspercentage 70% (non-profitorganisaties 100%) (General Annex G).

Now

Overheads: Indirect costs as a flat rate of 25% of direct costs in accordance with the model grant agreement.

Personnel costs: Actual costs in accordance with the Horizon Europe model grant agreement; funding rate 70% (non-profit organisations 100%) (General Annex G).

Why this scheme
Why this scheme: ChangedShow
Before

Het topic demonstreert langdurige batterijopslagtechnologie die de stabiliteit en flexibiliteit van het Europese elektriciteitsnet versterkt.

Now

The topic demonstrates long-duration battery storage technology that strengthens the stability and flexibility of the European electricity grid.

In brief
In brief: ChangedShow
Before

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. In China gevestigde entiteiten en entiteiten die direct of indirect door China worden gecontroleerd, kunnen niet deelnemen.

What for: Systeemdemonstraties van innovatieve batterijopslag voor lange duur (meer dan 8 uur) die nog niet op de markt is, om de stabiliteit en flexibiliteit van het Europese elektriciteitsnet te versterken. Projecten bereiken aan het eind TRL 6-7.

What you get: Een subsidie met een financieringspercentage van maximaal 70% (non-profitorganisaties tot 100%); de Commissie acht een EU-bijdrage van ongeveer € 9,4 miljoen per project passend. Het indicatieve budget voor het topic is € 18,8 miljoen.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is from an EU Member State. Entities established in China and entities directly or indirectly controlled by China cannot participate.

What for: System demonstrations of innovative long-duration battery storage (more than 8 hours) that is not yet on the market, to strengthen the stability and flexibility of the European electricity grid. Projects reach TRL 6-7 by the end.

What you get: A grant with a funding rate of up to 70% (non-profit organisations up to 100%); the Commission considers an EU contribution of approximately €9.4 million per project appropriate. The indicative budget for the topic is €18.8 million.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal between 5 May 2027 and 15 September 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected approximately 5 months after the deadline.

Goals
Goals: 4 removed, 4 newShow
Removed

Gedemonstreerde langdurige opslag Gedemonstreerde oplossingen voor langdurige energieopslag (LDES) op systeemniveau, gericht op meer stabiliteit, veerkracht en flexibiliteit van het Europese elektriciteitsnet.

Minder kritieke grondstoffen Een flinke vermindering van de Europese afhankelijkheid van kritieke grondstoffen door het gebruik van ruim beschikbare, goedkope en duurzame materialen.

Bouwstenen voor een EU-opslagstrategie Strategische inzichten voor een samenhangende EU-brede strategie voor stationaire opslag, die de Europese energieautonomie en duurzaamheid versterkt.

Betrouwbare operationele data Voldoende en reproduceerbare operationele data en inzichten als betrouwbare basis voor gedetailleerde techno-economische analyses.

New

Demonstrated long-duration storage Demonstrated long-duration energy storage (LDES) solutions at system level, aimed at greater stability, resilience and flexibility of the European electricity grid.

Fewer critical raw materials A significant reduction in Europe's dependence on critical raw materials through the use of abundant, low-cost and sustainable materials.

Building blocks for an EU storage strategy Strategic insights for a coherent EU-wide strategy for stationary storage that strengthens European energy autonomy and sustainability.

Reliable operational data Sufficient and reproducible operational data and insights as a reliable basis for detailed techno-economic analyses.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 4 removed, 6 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Uitsluiting van door China gecontroleerde entiteiten Entiteiten die direct of indirect worden gecontroleerd door China of een in China gevestigde juridische entiteit zijn niet deelnamegerechtigd (General Annex B, beperking op zeggenschap bij innovatieacties in kritieke technologiegebieden).

Deelname Joint Research Centre Het JRC mag deelnemen als begunstigde zonder financiering of als geassocieerde partner, maar niet bij de voorbereiding en indiening van het voorstel (General Annex B).

Beperking op overdracht van eigendom van resultaten De subsidieverlenende autoriteit kan tot 4 jaar na afloop van de actie bezwaar maken tegen overdracht van eigendom of exclusieve licentiëring van resultaten (specifieke bepaling van Annex 5, General Annex G).

New

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

In line with the “restriction on control in innovation actions in critical technology areas” delineated in General Annex B of the General Annexes, entities established in an eligible country but which are directly or indirectly controlled by China or by a legal entity established in China are not eligible to participate in the action.

In brief
In brief: AddedShow
Now

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. In China gevestigde entiteiten en entiteiten die direct of indirect door China worden gecontroleerd, kunnen niet deelnemen.

What for: Systeemdemonstraties van innovatieve batterijopslag voor lange duur (meer dan 8 uur) die nog niet op de markt is, om de stabiliteit en flexibiliteit van het Europese elektriciteitsnet te versterken. Projecten bereiken aan het eind TRL 6-7.

What you get: Een subsidie met een financieringspercentage van maximaal 70% (non-profitorganisaties tot 100%); de Commissie acht een EU-bijdrage van ongeveer € 9,4 miljoen per project passend. Het indicatieve budget voor het topic is € 18,8 miljoen.

What you need to do: Dien van 5 mei 2027 tot uiterlijk 15 september 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Projects are expected to contribute to all of the following outcomes: - Demonstrated system-level long-duration energy storage (LDES) solutions, explicitly aimed at enhancing grid stability, resilience, and flexibility in Europe. - Substantial reduction of Europe's dependence on critical raw materials through the use of abundant, low-cost, and sustainable materials. - Contribute to strategic insights for a coherent EU-wide stationary storage deployment strategy, enhancing European energy autonomy and sustainability. - Sufficient and reproducible operational data and insights to serve as reliable input towards detailed technoeconomic analyses.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: batterijopslag, Cluster 5 Climate, Energy and Mobility, Horizon Europe, HORIZON-CL5-2027-05-D2-08, kritieke grondstoffen, langdurige energieopslag, netstabiliteit
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 40 pagina's voor een IA)
Goals
Goals: 4 newShow
New

Gedemonstreerde langdurige opslag Gedemonstreerde oplossingen voor langdurige energieopslag (LDES) op systeemniveau, gericht op meer stabiliteit, veerkracht en flexibiliteit van het Europese elektriciteitsnet.

Minder kritieke grondstoffen Een flinke vermindering van de Europese afhankelijkheid van kritieke grondstoffen door het gebruik van ruim beschikbare, goedkope en duurzame materialen.

Bouwstenen voor een EU-opslagstrategie Strategische inzichten voor een samenhangende EU-brede strategie voor stationaire opslag, die de Europese energieautonomie en duurzaamheid versterkt.

Betrouwbare operationele data Voldoende en reproduceerbare operationele data en inzichten als betrouwbare basis voor gedetailleerde techno-economische analyses.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
17 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2027-05-D2-08 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.