Skip to content
Opening soonHORIZON-CL5-2027-02-D3-33CINEAOne-off

Support to the SET Plan stakeholders’ groups in geothermal energy

Support for the SET Plan stakeholders in geothermal energy.

Horizon Europe coordination and support action (lump sum, around €380,000, one project) supporting the ETIP and the Implementation Working Group for geothermal energy under the SET Plan.

Opening soon
15
days until opening
Opens on 3 December 2026
HORIZON-CL5-2027-02-D3-33
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Support to the SET Plan stakeholders’ groups in geothermal energy?

Who
Companies of any size, research organisations, public authorities, foundations and associations from an EU Member State or Associated Country; a single applicant is sufficient.
General Annex B (Entities eligible to participate; Coordination and Support Actions; Consortium composition)
What for
Support for the SET Plan stakeholder groups for geothermal energy, to strengthen the research and innovation agenda for geothermal energy in Europe.
Expected Outcome; Scope
What you get
A lump sum grant based on 100% of the eligible costs; the indicative budget for the topic is €0.38 million, for at most one project.
Specific conditions (Indicative budget; Procedure; Legal and financial set-up); General Annex G (Funding rates)
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 3 December 2026 until 31 March 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B and a detailed budget table for the lump sum. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Action (planned opening, deadlines); General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

To strengthen the research and innovation agenda for geothermal energy in Europe.

01
Science-based policy
European climate and energy policy is supported with scientific evidence.
02
Implementation of the SET Plan
The implementation of the SET Plan and its contribution to the Green Deal Industrial Plan, the Net Zero Industry Act and the European Research Area are facilitated.
03
Recognised stakeholder forums
The SET Plan stakeholder forums are recognised as key players in the clean energy transition.
04
Social and economic impacts
The social and economic impacts of the energy transition are addressed by taking into account the interests, needs and concerns of end users and value chain actors.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

In 2015, the launch of the Energy Union saw the SET Plan (Strategic Energy Technology Plan) incorporated as the Energy Union’s fifth pillar on ‘Research, Innovation and Competitiveness’. With the 2023 Communication on the revision of the SET Plan, its strategic objectives were harmonised with the European Green Deal, REPowerEU and the Green Deal Industrial Plan. Moreover, the SET Plan became a structural policy under the European Research Area. In 2024, the SET Plan was enshrined in the Net Zero Industry Act and the SET Plan Steering Group was established as a high-level expert group.

Read more

In the geothermal sector, European Technology and Innovation Platform (ETIP), and SET Plan Implementation Working Group (IWG) fora support the development and implementation of the SET Plan priorities by bringing together relevant stakeholders in geothermal energy key areas from industry, research organisations and, where applicable, SET Plan countries’ government representatives.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
Coordination and Support Actions – To be eligible to participate as beneficiaries (or affiliated entities) in ‘Coordination and support’ actions, legal entities must be established in a Member State or Associated Country, unless the specific call/topic conditions provide otherwise (in which case the general rules for eligibility for funding apply).
02
Applications for ‘Coordination and support’ actions may be submitted by one or more legal entities, which may be established in a Member State, Associated Country or, in exceptional cases and if provided for in the specific call/topic conditions, in another third country.
03
Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
04
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Geothermie en bodemenergieOnderzoek, ontwikkeling en innovatieEnergie, klimaat en verduurzaming
Funding

What do you get?

100% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €0.38 million appropriate (lump sum). At most one project will be funded.
€380k · Indicative topic budget, expected to fund 1 project.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared to two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

3
DEC
HORIZON-CL5-2027-02-D3-33 opens 3 December 2026
Action (planned opening, deadlines)
Cycle: Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative data of the participants and summarised budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 28 pages)
  • Detailed budget table (HE LS) for the lump sum budget
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Not eligible
Materials
Not eligible
Subcontracting
Not eligible
Equipment
Not eligible
Land
Not eligible
Buildings
Not eligible
Overheads
Not eligible
Travel costs
Not eligible
Other costs
Lump sum: fixed contribution per work package, no cost reporting. Funding rate 100%.
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Ondersteuning van de SET-plan-stakeholders in geothermie.

Now

Support for the SET Plan stakeholders in geothermal energy.

Description
Description: ChangedShow
Before

Het project ondersteunt het Europese technologie- en innovatieplatform en de implementatiewerkgroep voor geothermie bij hun werk binnen het SET-plan, met aandacht voor de behoeften van de sector, nieuwe Europese beleidsprioriteiten en afstemming met andere initiatieven.

Now

The project supports the European Technology and Innovation Platform and the Implementation Working Group for geothermal energy in their work within the SET Plan, with attention to the needs of the sector, new European policy priorities and alignment with other initiatives.

Short description
Short description: ChangedShow
Before

Horizon Europe-coördinatie- en ondersteuningsactie (lump sum, circa € 380.000, één project) die het ETIP en de implementatiewerkgroep voor geothermie onder het SET-plan ondersteunt.

Now

Horizon Europe coordination and support action (lump sum, around €380,000, one project) supporting the ETIP and the Implementation Working Group for geothermal energy under the SET Plan.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Now

Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 1 project.

Now

Indicative topic budget, expected to fund 1 project.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 0,38 mln EU-bijdrage passend (lump sum). Er wordt maximaal één project gefinancierd.

Now

No binding maximum; the Commission considers an EU contribution of around €0.38 million appropriate (lump sum). At most one project will be funded.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants), and the same costs may never be declared to two different EU actions (General Annex G).

Search engine title
SET-plan geothermie ondersteuning (Horizon CL5) becomes SET Plan geothermal energy support (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-ondersteuningsactie (lump sum, circa € 380.000) voor de SET-plan-stakeholders in geothermie.

Now

Horizon Europe support action (lump sum, around €380,000) for the SET Plan stakeholders in geothermal energy.

Keywords
aardwarmte, Cluster 5 Climate, Energy and Mobility, geothermie, Horizon Europe, HORIZON-CL5-2027-02-D3-33, SET Plan, stakeholderplatform becomes Cluster 5 Climate, Energy and Mobility, geothermal energy, geothermal heat, Horizon Europe, HORIZON-CL5-2027-02-D3-33, SET Plan, stakeholder platform
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 28 pagina's); Gedetailleerde begrotingstabel (HE LS) voor de lump-sumbegroting becomes Application form Part A: administrative data of the participants and summarised budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 28 pages); Detailed budget table (HE LS) for the lump sum budget
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording. Financieringspercentage 100%.

Now

Other costs: Lump sum: fixed contribution per work package, no cost reporting. Funding rate 100%.

Why this scheme
Why this scheme: ChangedShow
Before

De onderzoeks- en innovatieagenda voor geothermie in Europa versterken.

Now

To strengthen the research and innovation agenda for geothermal energy in Europe.

In brief
In brief: ChangedShow
Before

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen uit een EU-lidstaat of geassocieerd land; één aanvrager volstaat.

What for: Ondersteuning van de stakeholdergroepen van het SET-plan voor geothermie, om de onderzoeks- en innovatieagenda voor geothermie in Europa te versterken.

What you get: Een lumpsumsubsidie op basis van 100% van de subsidiabele kosten; het indicatieve budget voor het topic is € 0,38 miljoen, voor maximaal één project.

What you need to do: Dien van 3 december 2026 tot uiterlijk 31 maart 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel voor de lump sum. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: Companies of any size, research organisations, public authorities, foundations and associations from an EU Member State or Associated Country; a single applicant is sufficient.

What for: Support for the SET Plan stakeholder groups for geothermal energy, to strengthen the research and innovation agenda for geothermal energy in Europe.

What you get: A lump sum grant based on 100% of the eligible costs; the indicative budget for the topic is €0.38 million, for at most one project.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 3 December 2026 until 31 March 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B and a detailed budget table for the lump sum. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.

Goals
Goals: 4 removed, 4 newShow
Removed

Wetenschappelijk onderbouwd beleid Europees klimaat- en energiebeleid wordt ondersteund met wetenschappelijk bewijs.

Uitvoering van het SET Plan De uitvoering van het SET Plan en de bijdrage daarvan aan het Green Deal Industrial Plan, de Net Zero Industry Act en de Europese Onderzoeksruimte worden vergemakkelijkt.

Erkende stakeholderfora De stakeholderfora van het SET Plan worden erkend als belangrijke spelers in de schone-energietransitie.

Maatschappelijke en economische effecten De maatschappelijke en economische effecten van de energietransitie worden aangepakt door rekening te houden met de belangen, behoeften en zorgen van eindgebruikers en partijen in de waardeketen.

New

Science-based policy European climate and energy policy is supported with scientific evidence.

Implementation of the SET Plan The implementation of the SET Plan and its contribution to the Green Deal Industrial Plan, the Net Zero Industry Act and the European Research Area are facilitated.

Recognised stakeholder forums The SET Plan stakeholder forums are recognised as key players in the clean energy transition.

Social and economic impacts The social and economic impacts of the energy transition are addressed by taking into account the interests, needs and concerns of end users and value chain actors.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 2 removed, 4 newShow
Removed

Eén aanvrager volstaat Coördinatie- en ondersteuningsactie: één juridische entiteit uit een EU-lidstaat of geassocieerd land kan aanvragen (General Annex B).

Maximaal één project De subsidieverlener financiert maximaal één project.

New

Coordination and Support Actions – To be eligible to participate as beneficiaries (or affiliated entities) in ‘Coordination and support’ actions, legal entities must be established in a Member State or Associated Country, unless the specific call/topic conditions provide otherwise (in which case the general rules for eligibility for funding apply).

Applications for ‘Coordination and support’ actions may be submitted by one or more legal entities, which may be established in a Member State, Associated Country or, in exceptional cases and if provided for in the specific call/topic conditions, in another third country.

Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

In brief
In brief: AddedShow
Now

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen uit een EU-lidstaat of geassocieerd land; één aanvrager volstaat.

What for: Ondersteuning van de stakeholdergroepen van het SET-plan voor geothermie, om de onderzoeks- en innovatieagenda voor geothermie in Europa te versterken.

What you get: Een lumpsumsubsidie op basis van 100% van de subsidiabele kosten; het indicatieve budget voor het topic is € 0,38 miljoen, voor maximaal één project.

What you need to do: Dien van 3 december 2026 tot uiterlijk 31 maart 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B en een gedetailleerde begrotingstabel voor de lump sum. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

In 2015, the launch of the Energy Union saw the SET Plan (Strategic Energy Technology Plan) incorporated as the Energy Union’s fifth pillar on ‘Research, Innovation and Competitiveness’. With the 2023 Communication on the revision of the SET Plan, its strategic objectives were harmonised with the European Green Deal, REPowerEU and the Green Deal Industrial Plan. Moreover, the SET Plan became a structural policy under the European Research Area. In 2024, the SET Plan was enshrined in the Net Zero Industry Act and the SET Plan Steering Group was established as a high-level expert group. In the geothermal sector, European Technology and Innovation Platform (ETIP), and SET Plan Implementation Working Group (IWG) fora support the development and implementation of the SET Plan priorities by bringing together relevant stakeholders in geothermal energy key areas from industry, research organisations and, where applicable, SET Plan countries’ government representatives.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: aardwarmte, Cluster 5 Climate, Energy and Mobility, geothermie, Horizon Europe, HORIZON-CL5-2027-02-D3-33, SET Plan, stakeholderplatform
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 28 pagina's); Gedetailleerde begrotingstabel (HE LS) voor de lump-sumbegroting
Goals
Goals: 4 newShow
New

Wetenschappelijk onderbouwd beleid Europees klimaat- en energiebeleid wordt ondersteund met wetenschappelijk bewijs.

Uitvoering van het SET Plan De uitvoering van het SET Plan en de bijdrage daarvan aan het Green Deal Industrial Plan, de Net Zero Industry Act en de Europese Onderzoeksruimte worden vergemakkelijkt.

Erkende stakeholderfora De stakeholderfora van het SET Plan worden erkend als belangrijke spelers in de schone-energietransitie.

Maatschappelijke en economische effecten De maatschappelijke en economische effecten van de energietransitie worden aangepakt door rekening te houden met de belangen, behoeften en zorgen van eindgebruikers en partijen in de waardeketen.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
15 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2027-02-D3-33 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.