Skip to content
Opening soonHORIZON-CL5-2027-02-D3-09CINEAOne-off

Innovative technologies and solutions to improve wave and tidal energy systems

Innovations for wave and tidal energy.

Horizon Europe Innovation Action (around €43 million, one project) that improves wave and tidal energy technology through cascade grants to third parties, up to TRL 6-7.

Opening soon
15
days until opening
Opens on 3 December 2026
HORIZON-CL5-2027-02-D3-09
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Innovative technologies and solutions to improve wave and tidal energy systems?

Who
Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is in an EU Member State. Entities established in China are excluded.
General Annex B (Entities eligible to participate; Restrictions on the participation of legal entities established in China; Entities eligible for funding; Consortium composition)
What for
Innovative technologies and solutions that improve wave and tidal energy systems and bring them closer to commercial application, up to TRL 6-7 at the end of the project; part of the work is carried out through mandatory grants to third parties.
Expected Outcome; Scope; Specific conditions (Technology Readiness Level; Legal and financial set-up)
What you get
A grant of 70% of the eligible costs (non-profit organisations up to 100%); the indicative budget for the topic is €43 million, expected to fund one project.
Specific conditions (Indicative budget); General Annex G (Funding rates)
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal from 3 December 2026 until 31 March 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; the results are expected around 5 months after the deadline.
Action (planned opening, deadlines); General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

Bringing wave and tidal energy closer to commercial application.

01
Implementing the SET Plan for ocean energy
Progress on the research and innovation priorities and targets of the SET Plan for ocean energy.
02
Better wave and tidal technology
Energy producers and consumers benefit from better wave and tidal energy technology: more efficient and flexible, cheaper, more reliable and more sustainable, over the entire lifetime of an ocean energy farm from installation to decommissioning.
03
Coordination and cooperation
Efficient support for research and innovation in ocean energy through coordination and cooperation between stakeholders, without fragmentation, as a boost for the development of wave and tidal energy.
04
Greater contribution to the energy system
A greater contribution of ocean energy to the energy system, with minimal impact on health and the environment (in particular biodiversity) and at the lowest possible cost.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Project results are expected to contribute to all following expected outcomes: - Advance in the realisation of the Strategic Energy Technology (SET) Plan’s research and innovation priorities and targets for ocean energy; - Energy producers and consumers benefit from increased performance of wave and tidal energy technologies with the focus on efficiency and flexibility, reduced cost, improved reliability and sustainability, operation and maintenance, robustness and security during all stages of the lifetime of an ocean energy farm from installation, operation and maintenance to decommissioning; - Efficient and effective support to ocean energy research and innovation through alignment and cooperation among different actors, avoiding fragmentation of efforts providing effectively a significant developmental boost of wave and tidal energy technologies. - Increased contribution of ocean energy to the energy system, with minimal impacts on health and the environment (notably biodiversity) and at the lowest possible cost.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
Accordingly: … (1) Innovation Actions: Legal entities established in China are not eligible to participate in any Horizon Europe Innovation Action;
02
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
03
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
04
Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.
05
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
06
Beneficiaries must provide financial support to third parties (FSTP). The support to third parties can only be provided in the form of grants.
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieEnergie, klimaat en verduurzamingWaterenergie
Project phase
DevelopmentDemonstration
Funding

What do you get?

70% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €43 million appropriate. Financial support to third parties is mandatory, up to €800,000 per third party.
€43m · Indicative topic budget, expected to fund 1 project.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

3
DEC
HORIZON-CL5-2027-02-D3-09 opens 3 December 2026
Action (planned opening, deadlines)
Cycle: Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative details of the participants and summarised budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 60 pages; the topic increases the standard limit)
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Materials
Not eligible
Subcontracting
Equipment
Land
Not eligible
Buildings
Not eligible
Overheads
Travel costs
Other costs
Actual costs in accordance with General Annex G; funding rate 70% (non-profit entities up to 100%).
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Innovaties voor golf- en getijdenenergie.

Now

Innovations for wave and tidal energy.

Description
Description: ChangedShow
Before

Eén groot project draagt bij aan de SET-plan-doelen voor oceaanenergie. Via opeenvolgende calls voor derden worden componenten en systemen voor golf- en getijdenenergie ontwikkeld en gevalideerd, gericht op hogere prestaties, betrouwbaarheid en lagere kosten.

Now

One large project contributes to the SET Plan targets for ocean energy. Through successive calls for third parties, components and systems for wave and tidal energy are developed and validated, aimed at higher performance, reliability and lower costs.

Short description
Short description: ChangedShow
Before

Horizon Europe-innovatieactie (circa € 43 mln, één project) die golf- en getijdenenergietechnologie verbetert via cascade-subsidies aan derden, tot TRL 6-7.

Now

Horizon Europe Innovation Action (around €43 million, one project) that improves wave and tidal energy technology through cascade grants to third parties, up to TRL 6-7.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Now

Evaluation results approximately 5 months after the deadline; signature of the grant agreement approximately 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 1 project.

Now

Indicative topic budget, expected to fund 1 project.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 43 mln EU-bijdrage passend. Financiële steun aan derden is verplicht, maximaal € 800.000 per derde.

Now

No binding maximum; the Commission considers an EU contribution of around €43 million appropriate. Financial support to third parties is mandatory, up to €800,000 per third party.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
Golf- en getijdenenergie (Horizon CL5) becomes Wave and tidal energy (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-innovatieactie van circa € 43 mln voor golf- en getijdenenergie, met subsidies aan derden tot € 800.000.

Now

Horizon Europe Innovation Action of around €43 million for wave and tidal energy, with grants to third parties of up to €800,000.

Keywords
Cluster 5 Energy Supply, getijdenenergie, golfenergie, Horizon Europe, HORIZON-CL5-2027-02-D3-09, oceaanenergie becomes Cluster 5 Energy Supply, Horizon Europe, HORIZON-CL5-2027-02-D3-09, ocean energy, tidal energy, wave energy
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 60 pagina's; de topic verhoogt de standaardlimiet) becomes Application form Part A: administrative details of the participants and summarised budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 60 pages; the topic increases the standard limit)
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Werkelijke kosten (actual costs) volgens General Annex G; financieringspercentage 70% (non-profit entiteiten tot 100%).

Now

Other costs: Actual costs in accordance with General Annex G; funding rate 70% (non-profit entities up to 100%).

Why this scheme
Why this scheme: ChangedShow
Before

Golf- en getijdenenergie dichter bij commerciële toepassing brengen.

Now

Bringing wave and tidal energy closer to commercial application.

In brief
In brief: ChangedShow
Before

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan minstens één in een EU-lidstaat. In China gevestigde entiteiten zijn uitgesloten.

What for: Innovatieve technologieën en oplossingen die golf- en getijdenenergiesystemen verbeteren en dichter bij commerciële toepassing brengen, tot TRL 6-7 aan het einde van het project; een deel van het werk loopt via verplichte subsidies aan derden.

What you get: Een subsidie van 70% van de subsidiabele kosten (non-profitorganisaties tot 100%); het indicatieve budget voor het topic is € 43 miljoen, naar verwachting voor één project.

What you need to do: Dien van 3 december 2026 tot uiterlijk 31 maart 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent entities from three different countries, at least one of which is in an EU Member State. Entities established in China are excluded.

What for: Innovative technologies and solutions that improve wave and tidal energy systems and bring them closer to commercial application, up to TRL 6-7 at the end of the project; part of the work is carried out through mandatory grants to third parties.

What you get: A grant of 70% of the eligible costs (non-profit organisations up to 100%); the indicative budget for the topic is €43 million, expected to fund one project.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 3 December 2026 until 31 March 2027 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; the results are expected around 5 months after the deadline.

Goals
Goals: 4 removed, 4 newShow
Removed

Uitvoering SET-plan oceaanenergie Vooruitgang bij de onderzoeks- en innovatieprioriteiten en doelen van het SET-plan voor oceaanenergie.

Betere golf- en getijdentechnologie Energieproducenten en -verbruikers profiteren van betere golf- en getijdenenergietechnologie: efficiënter en flexibeler, goedkoper, betrouwbaarder en duurzamer, over de hele levensduur van een oceaanenergiepark van installatie tot ontmanteling.

Afstemming en samenwerking Efficiënte ondersteuning van onderzoek en innovatie in oceaanenergie door afstemming en samenwerking tussen actoren, zonder versnippering, als impuls voor de ontwikkeling van golf- en getijdenenergie.

Grotere bijdrage aan het energiesysteem Een grotere bijdrage van oceaanenergie aan het energiesysteem, met minimale gevolgen voor gezondheid en milieu (met name biodiversiteit) en tegen de laagst mogelijke kosten.

New

Implementing the SET Plan for ocean energy Progress on the research and innovation priorities and targets of the SET Plan for ocean energy.

Better wave and tidal technology Energy producers and consumers benefit from better wave and tidal energy technology: more efficient and flexible, cheaper, more reliable and more sustainable, over the entire lifetime of an ocean energy farm from installation to decommissioning.

Coordination and cooperation Efficient support for research and innovation in ocean energy through coordination and cooperation between stakeholders, without fragmentation, as a boost for the development of wave and tidal energy.

Greater contribution to the energy system A greater contribution of ocean energy to the energy system, with minimal impact on health and the environment (in particular biodiversity) and at the lowest possible cost.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 3 removed, 6 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Verplichte steun aan derden Begunstigden verstrekken subsidies aan derden (maximaal € 800.000 per derde) voor ontwikkeling en validatie van componenten.

Langere aanvraag Het paginalimiet voor de aanvraag is verhoogd naar 60 pagina's.

New

Accordingly: … (1) Innovation Actions: Legal entities established in China are not eligible to participate in any Horizon Europe Innovation Action;

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Eligible activities are the ones described in the call conditions. Applications will only be considered eligible if their content corresponds, wholly or in part, to the topic description for which it is submitted.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

Beneficiaries must provide financial support to third parties (FSTP). The support to third parties can only be provided in the form of grants.

In brief
In brief: AddedShow
Now

Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke entiteiten uit drie verschillende landen, waarvan minstens één in een EU-lidstaat. In China gevestigde entiteiten zijn uitgesloten.

What for: Innovatieve technologieën en oplossingen die golf- en getijdenenergiesystemen verbeteren en dichter bij commerciële toepassing brengen, tot TRL 6-7 aan het einde van het project; een deel van het werk loopt via verplichte subsidies aan derden.

What you get: Een subsidie van 70% van de subsidiabele kosten (non-profitorganisaties tot 100%); het indicatieve budget voor het topic is € 43 miljoen, naar verwachting voor één project.

What you need to do: Dien van 3 december 2026 tot uiterlijk 31 maart 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Project results are expected to contribute to all following expected outcomes: - Advance in the realisation of the Strategic Energy Technology (SET) Plan’s research and innovation priorities and targets for ocean energy; - Energy producers and consumers benefit from increased performance of wave and tidal energy technologies with the focus on efficiency and flexibility, reduced cost, improved reliability and sustainability, operation and maintenance, robustness and security during all stages of the lifetime of an ocean energy farm from installation, operation and maintenance to decommissioning; - Efficient and effective support to ocean energy research and innovation through alignment and cooperation among different actors, avoiding fragmentation of efforts providing effectively a significant developmental boost of wave and tidal energy technologies. - Increased contribution of ocean energy to the energy system, with minimal impacts on health and the environment (notably biodiversity) and at the lowest possible cost.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie ongeveer 5 maanden na de deadline; ondertekening van de subsidieovereenkomst ongeveer 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: Cluster 5 Energy Supply, getijdenenergie, golfenergie, Horizon Europe, HORIZON-CL5-2027-02-D3-09, oceaanenergie
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 60 pagina's; de topic verhoogt de standaardlimiet)
Goals
Goals: 4 newShow
New

Uitvoering SET-plan oceaanenergie Vooruitgang bij de onderzoeks- en innovatieprioriteiten en doelen van het SET-plan voor oceaanenergie.

Betere golf- en getijdentechnologie Energieproducenten en -verbruikers profiteren van betere golf- en getijdenenergietechnologie: efficiënter en flexibeler, goedkoper, betrouwbaarder en duurzamer, over de hele levensduur van een oceaanenergiepark van installatie tot ontmanteling.

Afstemming en samenwerking Efficiënte ondersteuning van onderzoek en innovatie in oceaanenergie door afstemming en samenwerking tussen actoren, zonder versnippering, als impuls voor de ontwikkeling van golf- en getijdenenergie.

Grotere bijdrage aan het energiesysteem Een grotere bijdrage van oceaanenergie aan het energiesysteem, met minimale gevolgen voor gezondheid en milieu (met name biodiversiteit) en tegen de laagst mogelijke kosten.

7 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
14 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2027-02-D3-09 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.