De-risking renewable fuel technologies through transnational pre-commercial procurement of renewable fuel industrial value chains

De-risking renewable fuel technology through transnational pre-commercial procurement.

Horizon Europe pre-commercial procurement (PCP, around €40 million, 1 project expected) through which public procurers de-risk the development and demonstration of renewable fuel value chains.

Next deadline
13
days
1 December 2026
HORIZON-CL5-2026-11-D3-04
View all deadlines
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is De-risking renewable fuel technologies through transnational pre-commercial procurement of renewable fuel industrial value chains?

Who
A consortium of at least three independent entities from three countries, including at least two public procurers from different Member States or Associated Countries; companies of any size, research organisations, public authorities, foundations and associations can participate.
General Annex B (Entities eligible to participate, Consortium composition)
What for
A transnational pre-commercial procurement (PCP) of research and development to develop and reduce the risks of essential production chains for renewable fuels, so that Europe builds its own production chain where renewable fuels are the main long-term solution.
Expected Outcome; Scope
What you get
A grant covering 100% of the eligible costs (pre-commercial procurement). The indicative budget for the topic is €40 million.
Specific conditions (Indicative budget, Type of Action); General Annex G, Funding rates
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal between 4 August 2026 and 1 December 2026 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Opening; Deadline(s); Call overview, footnote on deadlines; General Annex F

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

To build a European production chain for renewable fuels where they are the main long-term solution.

01
Less risk in value chains
Public authorities, industry, technology providers, energy producers and consumers benefit from reduced risk in cost-effective renewable fuel value chains that can contribute to commercial production in Europe after 2030, with better access to finance and more market opportunities.
02
Better renewable fuel technology
Energy producers, the cleantech industry, researchers and consumers benefit from improved performance, lower environmental impact, greater security and competitiveness of renewable fuel technologies, and from new market opportunities.
03
Shared costs of de-risking
Society, public authorities and industry share and reduce the costs of de-risking by engaging several competing suppliers in parallel; this stimulates cross-border investment and counters supplier lock-in.
04
Implementation of the SET Plan
The SET Plan action on renewable fuels and bioenergy is supported through better alignment of public and private research priorities and funding mechanisms.
05
Faster permitting
Policymakers and regulators gain evidence to speed up permitting procedures and increase public acceptance of innovative, sustainable renewable fuel projects.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

An exceptional effort is needed to develop, demonstrate and de-risk essential renewable fuels technologies and establish their industrial value chains in a cost-effective way to cover the EU needs where renewable fuels are the main long-term solution. Proposals should steer the development of these technologies at EU level and bring them to the market. Pre-commercial procurement of R&D, validation and possibly, first deployment of industrial value chains of essential renewable fuel technologies is considered an effective tool to de-risk such activities and overcome the “valley of death” because real take off by engaging primarily concerned contracting entities is expected.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
02
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
03
Applications for ‘Pre-commercial procurement’ actions and ‘Public procurement of innovative solutions’ actions must also fulfil the eligibility criteria of three independent legal entities as beneficiaries as explained above, out of which a minimum of two beneficiaries must be independent legal entities that are public procurers … each established in a different Member State or Associated Country and with at least one of them established in a Member State.
04
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
05
The procurement must be open to providers of R&D services established in any EU Member States and Associated Countries.
06
Hydrogen production as end-product is not in scope.
07
The PCP/PPI must be prepared and executed by one of the following: - by one or more public procurer(s), plus possibly one or more private and/or NGO procurer(s) that provide similar services of public interest, that is (are) responsible for the acquisition and/or regulatory strategy of the relevant innovative solutions and aim to obtain ambitious quality and efficiency improvements in the area of the PCP/PPI; or - by entities with a mandate from one or more of these procurers to act on their behalf in the procurement (e.g. central purchasing bodies).
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Onderzoek, ontwikkeling en innovatieEnergie, klimaat en verduurzamingDuurzame energieopwekking
Project phase
DevelopmentDemonstration
Funding

What do you get?

100% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €40 million per project appropriate.
€40m · Indicative topic budget, 1 project expected.
Budget status
Not published by the source
The sources do not say how much budget is left (checked 18 November 2026).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

1
DEC
HORIZON-CL5-2026-11-D3-04 closes 1 December 2026
Open since 4 August 2026
Opening; Deadline(s)Active
Cycle: Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative data of the participants and summarised budget (to be completed online)
  • Application form Part B: technical description of the project (PDF, maximum 60 pages; the topic raises the standard limit)
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).
Eligible costs

What can the money be spent on?

Personnel costs
Materials
Subcontracting
Equipment
Land
Not eligible
Buildings
Not eligible
Overheads
Indirect costs: flat rate of 25% of the eligible direct costs (General Annex G).
Travel costs
Other costs
Procurement costs of the PCP/PPI tender are eligible; the conditions of General Annex H apply.
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 5

Subtitle
Subtitle: ChangedShow
Before

Hernieuwbare brandstoftechnologie de-risken via transnationale pre-commerciële inkoop.

Now

De-risking renewable fuel technology through transnational pre-commercial procurement.

Description
Description: ChangedShow
Before

Publieke inkopers kopen via pre-commerciële inkoop R&D, validatie en demonstratie in om essentiële technologieën en industriële waardeketens voor hernieuwbare brandstoffen kosteneffectief te ontwikkelen en te de-risken, zodat binnenlandse commerciële productie na 2030 mogelijk wordt.

Now

Through pre-commercial procurement, public procurers purchase R&D, validation and demonstration to develop and de-risk essential technologies and industrial value chains for renewable fuels cost-effectively, enabling domestic commercial production after 2030.

Short description
Short description: ChangedShow
Before

Horizon Europe pre-commerciële inkoop (PCP, circa € 40 mln, naar verwachting 1 project) waarmee publieke inkopers de ontwikkeling en demonstratie van waardeketens voor hernieuwbare brandstoffen de-risken.

Now

Horizon Europe pre-commercial procurement (PCP, around €40 million, 1 project expected) through which public procurers de-risk the development and demonstration of renewable fuel value chains.

Cycle
Cycle: ChangedShow
Before

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Now

Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 1 project.

Now

Indicative topic budget, 1 project expected.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 40 mln EU-bijdrage per project passend.

Now

No binding maximum; the Commission considers an EU contribution of around €40 million per project appropriate.

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Now

No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).

Search engine title
PCP hernieuwbare brandstoffen (Horizon CL5) becomes Renewable fuels PCP (Horizon CL5)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe PCP-actie (circa € 40 mln) om waardeketens voor hernieuwbare brandstoffen via pre-commerciële inkoop te de-risken.

Now

Horizon Europe PCP action (around €40 million) to de-risk renewable fuel value chains through pre-commercial procurement.

Keywords
bio-energie, Cluster 5 Climate, Energy and Mobility, hernieuwbare brandstoffen, Horizon Europe, HORIZON-CL5-2026-11-D3-04, precommerciële inkoop becomes bioenergy, Cluster 5 Climate, Energy and Mobility, Horizon Europe, HORIZON-CL5-2026-11-D3-04, pre-commercial procurement, renewable fuels
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 60 pagina's; de topic verhoogt de standaardlimiet) becomes Application form Part A: administrative data of the participants and summarised budget (to be completed online); Application form Part B: technical description of the project (PDF, maximum 60 pages; the topic raises the standard limit)
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Climate, Infrastructure and Environment Executive Agency (CINEA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Climate, Infrastructure and Environment Executive Agency (CINEA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Inkoopkosten van de PCP/PPI-aanbesteding zijn subsidiabel; de voorwaarden van General Annex H gelden.

Overheads: Indirecte kosten: forfait van 25% van de subsidiabele directe kosten (General Annex G).

Now

Other costs: Procurement costs of the PCP/PPI tender are eligible; the conditions of General Annex H apply.

Overheads: Indirect costs: flat rate of 25% of the eligible direct costs (General Annex G).

Why this scheme
Why this scheme: ChangedShow
Before

Een Europese productieketen voor hernieuwbare brandstoffen opbouwen waar die de belangrijkste langetermijnoplossing zijn.

Now

To build a European production chain for renewable fuels where they are the main long-term solution.

In brief
In brief: ChangedShow
Before

Who: Een consortium van ten minste drie onafhankelijke entiteiten uit drie landen, waarvan ten minste twee publieke inkopers uit verschillende lidstaten of geassocieerde landen; bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen kunnen deelnemen.

What for: Een transnationale precommerciële inkoop (PCP) van onderzoek en ontwikkeling om essentiële productieketens voor hernieuwbare brandstoffen te ontwikkelen en de risico's ervan te verkleinen, zodat Europa een eigen productieketen opbouwt waar hernieuwbare brandstoffen de belangrijkste langetermijnoplossing zijn.

What you get: Een subsidie van 100% van de subsidiabele kosten (precommerciële inkoop). Het indicatieve budget voor het topic is € 40 miljoen.

What you need to do: Dien van 4 augustus 2026 tot uiterlijk 1 december 2026 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

Now

Who: A consortium of at least three independent entities from three countries, including at least two public procurers from different Member States or Associated Countries; companies of any size, research organisations, public authorities, foundations and associations can participate.

What for: A transnational pre-commercial procurement (PCP) of research and development to develop and reduce the risks of essential production chains for renewable fuels, so that Europe builds its own production chain where renewable fuels are the main long-term solution.

What you get: A grant covering 100% of the eligible costs (pre-commercial procurement). The indicative budget for the topic is €40 million.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal between 4 August 2026 and 1 December 2026 (17:00 Brussels time) at the latest, with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.

Goals
Goals: 5 removed, 5 newShow
Removed

Minder risico in waardeketens Overheden, industrie, technologieleveranciers, energieproducenten en consumenten profiteren van minder risico in kosteneffectieve waardeketens voor hernieuwbare brandstoffen die na 2030 kunnen bijdragen aan commerciële productie in Europa, met betere toegang tot financiering en meer marktkansen.

Betere hernieuwbare brandstoftechnologie Energieproducenten, cleantech-industrie, onderzoekers en consumenten profiteren van betere prestaties, minder milieu-impact, meer zekerheid en concurrentiekracht van hernieuwbare brandstoftechnologieën en van nieuwe marktkansen.

Gedeelde kosten van risicovermindering Gemeenschap, overheden en industrie delen en verlagen de kosten van risicovermindering door meerdere concurrerende leveranciers parallel in te zetten; dat stimuleert grensoverschrijdende investeringen en gaat leveranciersafhankelijkheid tegen.

Uitvoering van het SET-plan De SET-plan-actie voor hernieuwbare brandstoffen en bio-energie wordt ondersteund door betere afstemming van publieke en private onderzoeksprioriteiten en financieringsmechanismen.

Snellere vergunningverlening Beleidsmakers en toezichthouders krijgen onderbouwing om vergunningsprocedures te versnellen en de publieke acceptatie van innovatieve, duurzame projecten voor hernieuwbare brandstoffen te vergroten.

New

Less risk in value chains Public authorities, industry, technology providers, energy producers and consumers benefit from reduced risk in cost-effective renewable fuel value chains that can contribute to commercial production in Europe after 2030, with better access to finance and more market opportunities.

Better renewable fuel technology Energy producers, the cleantech industry, researchers and consumers benefit from improved performance, lower environmental impact, greater security and competitiveness of renewable fuel technologies, and from new market opportunities.

Shared costs of de-risking Society, public authorities and industry share and reduce the costs of de-risking by engaging several competing suppliers in parallel; this stimulates cross-border investment and counters supplier lock-in.

Implementation of the SET Plan The SET Plan action on renewable fuels and bioenergy is supported through better alignment of public and private research priorities and funding mechanisms.

Faster permitting Policymakers and regulators gain evidence to speed up permitting procedures and increase public acceptance of innovative, sustainable renewable fuel projects.

Show 4 earlier versions

19 October 2026scheme · version 4

Conditions
Conditions: 3 removed, 7 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Minimaal 2 publieke inkopers Van de begunstigden moeten er minimaal twee onafhankelijke publieke inkopers zijn, elk uit een ander EU-lidstaat of geassocieerd land en minimaal één uit een lidstaat; de voorwaarden van General Annex H gelden.

Paginalimiet 60 pagina's Vanwege de complexiteit van het topic is de paginalimiet van het voorstel verhoogd naar 60 pagina's (uitzondering op General Annex A).

New

To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Applications for ‘Pre-commercial procurement’ actions and ‘Public procurement of innovative solutions’ actions must also fulfil the eligibility criteria of three independent legal entities as beneficiaries as explained above, out of which a minimum of two beneficiaries must be independent legal entities that are public procurers … each established in a different Member State or Associated Country and with at least one of them established in a Member State.

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

The procurement must be open to providers of R&D services established in any EU Member States and Associated Countries.

Hydrogen production as end-product is not in scope.

The PCP/PPI must be prepared and executed by one of the following: - by one or more public procurer(s), plus possibly one or more private and/or NGO procurer(s) that provide similar services of public interest, that is (are) responsible for the acquisition and/or regulatory strategy of the relevant innovative solutions and aim to obtain ambitious quality and efficiency improvements in the area of the PCP/PPI; or - by entities with a mandate from one or more of these procurers to act on their behalf in the procurement (e.g. central purchasing bodies).

In brief
In brief: AddedShow
Now

Who: Een consortium van ten minste drie onafhankelijke entiteiten uit drie landen, waarvan ten minste twee publieke inkopers uit verschillende lidstaten of geassocieerde landen; bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen kunnen deelnemen.

What for: Een transnationale precommerciële inkoop (PCP) van onderzoek en ontwikkeling om essentiële productieketens voor hernieuwbare brandstoffen te ontwikkelen en de risico's ervan te verkleinen, zodat Europa een eigen productieketen opbouwt waar hernieuwbare brandstoffen de belangrijkste langetermijnoplossing zijn.

What you get: Een subsidie van 100% van de subsidiabele kosten (precommerciële inkoop). Het indicatieve budget voor het topic is € 40 miljoen.

What you need to do: Dien van 4 augustus 2026 tot uiterlijk 1 december 2026 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

An exceptional effort is needed to develop, demonstrate and de-risk essential renewable fuels technologies and establish their industrial value chains in a cost-effective way to cover the EU needs where renewable fuels are the main long-term solution. Proposals should steer the development of these technologies at EU level and bring them to the market. Pre-commercial procurement of R&D, validation and possibly, first deployment of industrial value chains of essential renewable fuel technologies is considered an effective tool to de-risk such activities and overcome the “valley of death” because real take off by engaging primarily concerned contracting entities is expected.

16 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).

Keywords
Added: bio-energie, Cluster 5 Climate, Energy and Mobility, hernieuwbare brandstoffen, Horizon Europe, HORIZON-CL5-2026-11-D3-04, precommerciële inkoop
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens van de deelnemers en samengevatte begroting (online in te vullen); Aanvraagformulier deel B: technische beschrijving van het project (pdf, maximaal 60 pagina's; de topic verhoogt de standaardlimiet)
Goals
Goals: 5 newShow
New

Minder risico in waardeketens Overheden, industrie, technologieleveranciers, energieproducenten en consumenten profiteren van minder risico in kosteneffectieve waardeketens voor hernieuwbare brandstoffen die na 2030 kunnen bijdragen aan commerciële productie in Europa, met betere toegang tot financiering en meer marktkansen.

Betere hernieuwbare brandstoftechnologie Energieproducenten, cleantech-industrie, onderzoekers en consumenten profiteren van betere prestaties, minder milieu-impact, meer zekerheid en concurrentiekracht van hernieuwbare brandstoftechnologieën en van nieuwe marktkansen.

Gedeelde kosten van risicovermindering Gemeenschap, overheden en industrie delen en verlagen de kosten van risicovermindering door meerdere concurrerende leveranciers parallel in te zetten; dat stimuleert grensoverschrijdende investeringen en gaat leveranciersafhankelijkheid tegen.

Uitvoering van het SET-plan De SET-plan-actie voor hernieuwbare brandstoffen en bio-energie wordt ondersteund door betere afstemming van publieke en private onderzoeksprioriteiten en financieringsmechanismen.

Snellere vergunningverlening Beleidsmakers en toezichthouders krijgen onderbouwing om vergunningsprocedures te versnellen en de publieke acceptatie van innovatieve, duurzame projecten voor hernieuwbare brandstoffen te vergroten.

6 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Climate, Infrastructure and Environment Executive Agency
Last verified
14 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL5-2026-11-D3-04 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.