Technologies for innovative processing of raw materials (IA)
Innovative processing of primary raw materials and mining waste.
Horizon Europe innovation action (around €10-12.5 million per project) for a pilot plant in the EU that recovers critical raw materials more efficiently from low-grade or complex ores and mining waste. Starts at TRL 5, ends at TRL 7.
This grant database is in beta
Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.
What is Technologies for innovative processing of raw materials (IA)?
Built from the details on this page, with nothing added by us.
Why does this scheme exist?
To make the EU less dependent on a few third countries for critical raw materials.
About the scheme
Compiled from passages of the scheme's official publication, with nothing added by us.
- Increased recovery rates of valuable raw materials, particularly critical raw materials from low grade or complex ores and/or from mining waste; - Increased economic performance in terms of higher material-, water-, energy- and cost-efficiency and flexibility in minerals processing and metallurgical processes; and - Improved health, safety and environmental performance of the operations throughout the whole life cycle that is considered, including a reduction in waste, wastewater and generation of emissions of air pollutants and a better recovery of resources from generated waste, reducing the environmental footprint and contributing to biodiversity and ecosystems preservation.
Conditions
Quoted verbatim from the scheme, with the article that sets each condition.
What do you get?
70% of your eligible project costs.
Deadlines & cycles
How do you apply?
- Application form Part A: administrative details of the participants and summarised budget (to be completed online)
- Application form Part B: technical description of the project (PDF, maximum 43 pages: 40 for an IA plus 3 additional pages for the business case and exploitation strategy)
What can the money be spent on?
Files & forms
What has changed?
10 November 2026scheme · version 6
Subtitle: ChangedShowHide
Innovatieve verwerking van primaire grondstoffen en mijnbouwafval.
Innovative processing of primary raw materials and mining waste.
Description: ChangedShowHide
Projecten ontwikkelen en demonstreren een pilotinstallatie in de EU die verwerkings- en raffinagetechnologie combineert voor hogere terugwinning van grondstoffen, vooral kritieke grondstoffen, uit laagwaardige of complexe ertsen en mijnbouwafval, met minder afval, water- en luchtvervuiling en een hogere energie-efficiëntie. Start op TRL 5, eindigt op TRL 7.
Projects develop and demonstrate a pilot plant in the EU that combines processing and refining technology for higher recovery of raw materials, especially critical raw materials, from low-grade or complex ores and mining waste, with less waste, water and air pollution and higher energy efficiency. Starts at TRL 5, ends at TRL 7.
Short description: ChangedShowHide
Horizon Europe-innovatieactie (circa € 10-12,5 mln per project) voor een pilotinstallatie in de EU die kritieke grondstoffen efficiënter wint uit laagwaardige of complexe ertsen en mijnbouwafval. Start op TRL 5, eindigt op TRL 7.
Horizon Europe innovation action (around €10-12.5 million per project) for a pilot plant in the EU that recovers critical raw materials more efficiently from low-grade or complex ores and mining waste. Starts at TRL 5, ends at TRL 7.
Cycle: ChangedShowHide
Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).
Evaluation results around 5 months after the deadline; signature of the grant agreement around 8 months after the deadline (General Annex F).
Note on the total budget: ChangedShowHide
Indicatief topicbudget, naar verwachting 4 projecten.
Indicative topic budget, 4 projects expected to be funded.
Note on the maximum: ChangedShowHide
Geen bindend maximum; de Commissie acht € 10 mln tot € 12,5 mln EU-bijdrage per project passend.
No binding maximum; the Commission considers an EU contribution of €10 million to €12.5 million per project appropriate.
Cumulation: ChangedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
No double funding: an action may receive only one grant from the EU budget (except EU Synergy grants) and the same costs may never be declared under two different EU actions (General Annex G).
Search engine description: ChangedShowHide
Horizon Europe-innovatieactie (circa € 10-12,5 mln) voor een EU-pilotinstallatie die kritieke grondstoffen uit ertsen en mijnafval wint.
Horizon Europe innovation action (around €10-12.5 million) for an EU pilot plant recovering critical raw materials from ores and mining waste.
Procedure: ChangedShowHide
Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Health and Digital Executive Agency (HaDEA).
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Health and Digital Executive Agency (HaDEA).
Notes per cost type: ChangedShowHide
Overheads: Indirecte kosten als forfaitair percentage van de directe kosten volgens de modelsubsidieovereenkomst.
Personnel costs: Werkelijke kosten volgens de modelsubsidieovereenkomst van Horizon Europe; financieringspercentage 70% (non-profitorganisaties 100%) (General Annex G).
Overheads: Indirect costs as a flat-rate percentage of direct costs in accordance with the model grant agreement.
Personnel costs: Actual costs in accordance with the Horizon Europe model grant agreement; funding rate 70% (non-profit organisations 100%) (General Annex G).
Why this scheme: ChangedShowHide
De EU minder afhankelijk maken van enkele derde landen voor kritieke grondstoffen.
To make the EU less dependent on a few third countries for critical raw materials.
In brief: ChangedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke rechtspersonen uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. Deelname is beperkt tot entiteiten uit EU-lidstaten, geassocieerde landen, OESO-landen, lidstaten van de Afrikaanse Unie, MERCOSUR, CARIFORUM, de Andesgemeenschap en landen met een grondstoffenpartnerschap of handelsakkoord met grondstoffenbepalingen, die niet worden gecontroleerd door een niet-toegelaten land; in China gevestigde entiteiten kunnen niet deelnemen.
What for: Innovatieprojecten die een pilotinstallatie in de EU ontwikkelen en valideren of demonstreren voor de verwerking en raffinage van (kritieke) grondstoffen uit laagwaardige of complexe ertsen en mijnafval, van TRL 5 tot TRL 7, zodat de EU minder afhankelijk wordt van enkele derde landen; recycling van afgedankte producten valt erbuiten.
What you get: Een subsidie van maximaal 70% van de subsidiabele kosten (100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van € 10 tot € 12,5 miljoen per project passend. Het indicatieve budget voor het topic is € 49 miljoen.
What you need to do: Dien van 13 oktober 2026 tot uiterlijk 2 februari 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
Who: Companies of any size, research organisations, public authorities, foundations and associations in a consortium of at least three independent legal entities from three different countries, at least one of which is from an EU Member State. Participation is limited to entities from EU Member States, Associated Countries, OECD countries, African Union Member States, MERCOSUR, CARIFORUM, the Andean Community and countries with a raw materials partnership or a trade agreement with raw materials provisions, which are not controlled by a non-eligible country; entities established in China cannot participate.
What for: Innovation projects that develop and validate or demonstrate a pilot plant in the EU for the processing and refining of (critical) raw materials from low-grade or complex ores and mining waste, from TRL 5 to TRL 7, so that the EU becomes less dependent on a few third countries; recycling of end-of-life products is excluded.
What you get: A grant of up to 70% of eligible costs (100% for non-profit organisations); the Commission considers an EU contribution of €10 to €12.5 million per project appropriate. The indicative budget for the topic is €49 million.
What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal from 13 October 2026 until 2 February 2027 at the latest (17:00 Brussels time), with application form Part A and Part B. Independent experts evaluate and rank the proposals; results are expected around 5 months after the deadline.
Goals: 3 removed, 3 newShowHide
Hogere terugwinning Meer waardevolle grondstoffen, vooral kritieke grondstoffen, worden teruggewonnen uit laagwaardige of complexe ertsen en uit mijnbouwafval.
Efficiëntere verwerking Mineraalverwerking en metallurgische processen presteren economisch beter door hogere materiaal-, water-, energie- en kostenefficiëntie en meer flexibiliteit.
Veiliger en schoner Gezondheid, veiligheid en milieuprestaties verbeteren over de hele levenscyclus, met minder afval, afvalwater en luchtverontreinigende emissies en betere terugwinning uit afval.
Higher recovery More valuable raw materials, especially critical raw materials, are recovered from low-grade or complex ores and from mining waste.
More efficient processing Mineral processing and metallurgical processes perform better economically through higher material, water, energy and cost efficiency and greater flexibility.
Safer and cleaner Health, safety and environmental performance improve across the entire life cycle, with less waste, wastewater and air-polluting emissions and better recovery from waste.
Show 5 earlier versionsShow less
19 October 2026scheme · version 5
Conditions: 3 removed, 8 newShowHide
Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).
Beperkte deelname naar land van vestiging Alleen entiteiten uit EU-lidstaten, geassocieerde landen, OESO-landen, Afrikaanse Unie, MERCOSUR, CARIFORUM, Andesgemeenschap en landen met een strategisch grondstoffenpartnerschap met de EU mogen deelnemen; anders is het voorstel niet ontvankelijk.
Pilotinstallatie in de EU Projecten valideren of demonstreren een pilotinstallatie in de EU die verwerkings- en raffinagetechnologie integreert.
To be eligible for funding, applicants must be established in one of the following countries: – the Member States of the European Union, including their outermost regions:
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
To increase EU resilience in raw materials supply chains and thus reduce the serious risk to the Union's strategic assets, economic and societal interests, autonomy and security associated with the current EU reliance on a few third countries for critical raw materials, by increasing sustainable and responsible sourcing of primary and secondary raw materials necessary to enable the green and digital transition and in alignment with the objectives of the Critical Raw Materials Act … participation in this topic is limited to legal entities established in Member States, associated countries, OECD countries, African Union Member States, MERCOSUR, CARIFORUM, Andean Community and countries with which the EU has concluded strategic partnerships on raw materials … as well as trade agreements (or association/economic partnership or equivalent agreements, including the new Clean Trade and Investment Partnerships) containing raw materials cooperation provisions (i.e. Energy and Raw materials chapters)
Proposals including legal entities which are not established in the countries that fall under the criteria above will be ineligible.
For the duly justified and exceptional reasons listed above, in order to guarantee the protection of the strategic interests of the Union and its Member States, entities established in an eligible country listed above, but which are directly or indirectly controlled by a non-eligible country or a non-eligible country entity, shall not participate in the action.
Actions should develop and validate / demonstrate pilot scale facility located in the EU integrating relevant processing and refining technologies for improved recovery of raw materials from low grade and/or complex ores from extractive wastes, reduction of waste and water and air pollution, higher energy efficiency and reduction of land and sea-use change, habitat loss, degradation and fragmentation.
Recycling of end-of-life products is excluded from this topic.
In brief: AddedShowHide
Who: Bedrijven van elke omvang, onderzoeksinstellingen, overheden, stichtingen en verenigingen in een consortium van ten minste drie onafhankelijke rechtspersonen uit drie verschillende landen, waarvan ten minste één uit een EU-lidstaat. Deelname is beperkt tot entiteiten uit EU-lidstaten, geassocieerde landen, OESO-landen, lidstaten van de Afrikaanse Unie, MERCOSUR, CARIFORUM, de Andesgemeenschap en landen met een grondstoffenpartnerschap of handelsakkoord met grondstoffenbepalingen, die niet worden gecontroleerd door een niet-toegelaten land; in China gevestigde entiteiten kunnen niet deelnemen.
What for: Innovatieprojecten die een pilotinstallatie in de EU ontwikkelen en valideren of demonstreren voor de verwerking en raffinage van (kritieke) grondstoffen uit laagwaardige of complexe ertsen en mijnafval, van TRL 5 tot TRL 7, zodat de EU minder afhankelijk wordt van enkele derde landen; recycling van afgedankte producten valt erbuiten.
What you get: Een subsidie van maximaal 70% van de subsidiabele kosten (100% voor non-profitorganisaties); de Commissie acht een EU-bijdrage van € 10 tot € 12,5 miljoen per project passend. Het indicatieve budget voor het topic is € 49 miljoen.
What you need to do: Dien van 13 oktober 2026 tot uiterlijk 2 februari 2027 (17:00 uur Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal, met aanvraagformulier deel A en deel B. Onafhankelijke experts beoordelen en rangschikken de voorstellen; de uitslag volgt naar verwachting circa 5 maanden na de deadline.
18 October 2026scheme · version 4
About the scheme: AddedShowHide
- Increased recovery rates of valuable raw materials, particularly critical raw materials from low grade or complex ores and/or from mining waste; - Increased economic performance in terms of higher material-, water-, energy- and cost-efficiency and flexibility in minerals processing and metallurgical processes; and - Improved health, safety and environmental performance of the operations throughout the whole life cycle that is considered, including a reduction in waste, wastewater and generation of emissions of air pollutants and a better recovery of resources from generated waste, reducing the environmental footprint and contributing to biodiversity and ecosystems preservation.
16 October 2026scheme · version 3
Cycle: AddedShowHide
Uitslag van de evaluatie rond 5 maanden na de deadline; ondertekening van de subsidieovereenkomst rond 8 maanden na de deadline (General Annex F).
Cumulation: AddedShowHide
Geen dubbele financiering: een actie kan maar één subsidie uit de EU-begroting krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd (General Annex G).
Goals: 3 newShowHide
Hogere terugwinning Meer waardevolle grondstoffen, vooral kritieke grondstoffen, worden teruggewonnen uit laagwaardige of complexe ertsen en uit mijnbouwafval.
Efficiëntere verwerking Mineraalverwerking en metallurgische processen presteren economisch beter door hogere materiaal-, water-, energie- en kostenefficiëntie en meer flexibiliteit.
Veiliger en schoner Gezondheid, veiligheid en milieuprestaties verbeteren over de hele levenscyclus, met minder afval, afvalwater en luchtverontreinigende emissies en betere terugwinning uit afval.
14 October 2026scheme · version 2
De call is open voor aanvragen.
7 October 2026scheme · version 1 · first publication
Contact & source
Start your HORIZON-CL4-2027-01-MAT-PROD-16 application
in Twin.
Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.