Skip to content
ClosedHORIZON-CL3-2026-01-INFRA-02REAOne-off

Security challenges of the green transition in urban und peri urban areas

Security risks of the green transition in urban areas.

Horizon Europe research action (lump sum, around €4 million, 1 project expected) on new security risks of green technology in urban and peri-urban areas, with at least 3 practitioners.

Deadline
Closed
This scheme no longer accepts applications.
Beta

This grant database is in beta

Until the official launch on 1 January 2027 we are making the final improvements. Our editors check every scheme, but details may still be incomplete or out of date. Check the official publication before you apply.

In brief

What is Security challenges of the green transition in urban und peri urban areas?

Who
Consortia of at least three independent legal entities, each from a different country (at least one from an EU Member State), with at least three practitioners from EU Member States or Associated Countries as beneficiaries, such as critical infrastructure operators, civil protection or emergency services. Legal entities established in China may not participate.
Destination (China); Eligibility conditions, met General Annex B
What for
Research into the security challenges of the green transition in urban and peri-urban areas, so that this transition proceeds securely.
Expected Outcome; Scope
What you get
A lump sum; the Commission considers an EU contribution of around €4 million per project appropriate. The indicative budget for this topic is €4 million.
Specific conditions: Expected EU contribution per project; Indicative budget; Legal and financial set-up of the Grant Agreements
What you need to do
Submit a proposal in a single stage via the Funding & Tenders Portal by 5 November 2026 at 17:00 Brussels time; the call opens on 6 May 2026. You add Part A and Part B of the application form, plus the detailed budget table for the lump sum.
Opening; Deadline(s); Budget overview

Built from the details on this page, with nothing added by us.

Purpose & impact

Why does this scheme exist?

Ensuring that the green transition in cities proceeds securely.

01
New security risks mapped
Potential new security risks of innovative technologies in urban and peri-urban areas are identified and analysed, including the consequences of incidents involving new technologies and environmental and climate risks.
02
Tools to measure changes
Innovative tools are developed to measure changes in (peri-)urban areas caused by the green transition, insofar as they affect security and resilience.
03
Measures verified and public support increased
Measures against security risks in areas with green technologies are verified, and awareness and public acceptance of the security aspects of the green transition grow.
04
Secure supply chains
The security, reliability and resilience of green technology supply chains are analysed, including technological and raw material dependencies and alignment with European strategic autonomy.
05
Evaluation methods for authorities and operators
Public authorities and critical infrastructure operators gain efficient evaluation methods for the secure deployment and integration of new technologies in (peri-)urban areas.
Description

About the scheme

Compiled from passages of the scheme's official publication, with nothing added by us.

Climate change and environmental degradation are an existential threat to the world, and the green transition is a critical component of the EU's strategy to reduce and mitigate their impacts, as well as to contribute to the European competitiveness. This approach is also part of the effort to transform Europe into a modern, resource-efficient, resilient and competitive economy. However, rapid deployment of new and emerging technologies, such as, but not limited to: green and grid-interactive roofs and walls, solar power installations, electric vehicle charging stations, energy storages, smart sensors and surveillance systems, green transportation systems, nature-based or other sustainable or reused construction materials, or specific infrastructure solutions may create security risks through new interdependencies including legacy infrastructure, the accumulation of deployed solutions, or otherwise create new potential risks and hazards of unknown scale and origin.

Am I eligible?

Conditions

Quoted verbatim from the scheme, with the article that sets each condition.

01
Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.
02
Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.
03
This topic requires involvement as beneficiaries of at least 3 relevant practitioners from EU Member States or Associated Countries. Depending on the specific focus of the proposal submitted, these practitioners should represent one or several of the following portfolios: - critical infrastructure operator, - authority responsible for critical infrastructure resilience, - civil protection authority, - safety or security first responders,
04
If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).
All sizes
Micro< 10 FTE
Small< 50 FTE
Medium< 250 FTE
Large≥ 250 FTE
Themes
Regionale en gebiedsontwikkelingVeiligheid, defensie en weerbaarheidOnderzoek, ontwikkeling en innovatieStedelijke ontwikkelingEnergie, klimaat en verduurzaming
Project phase
ResearchDevelopment
Funding

What do you get?

100% of your eligible project costs.

Note on the maximum
No binding maximum; the Commission considers an EU contribution of around €4.0 million per project appropriate (lump sum).
Total scheme budget
€4m · Indicative topic budget, 1 project expected.
Budget status
16 applications
as of 5 November 2026 · checked 18 November 2026 · 16 proposals submitted (submission numbers, 5 Nov 2026). · source
Cumulation
No double funding from the EU budget: an action may receive only one EU grant (except EU Synergy grants) and the same costs may never be declared under two different EU actions. Combination with an EU operating grant is possible if the project falls outside the work programme of that grant and the costs are kept separate.
Type
Direct grant (non-repayable)
Calendar

Deadlines & cycles

HORIZON-CL3-2026-01-INFRA-02 · 6 May 2026 to 5 November 2026Opening; Deadline(s)
Cycle: Outcome expected around 5 months after the deadline, signature of the grant agreement around 8 months after the deadline (General Annex F). General Annex F, Indicative timetable for evaluation and for signature of the grant agreement
Application

How do you apply?

Pre-registration
Required, before the full application
Required attachments
  • Application form Part A: administrative data, summary budget and call-specific questions (online in the submission system)
  • Application form Part B: technical description (upload as PDF)
  • Detailed budget table (lump sum)
  • Table 'Information about security practitioners' in the application form, for the mandatory participants from security practice
Procedure
Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Research Executive Agency (REA).
Eligible costs

What can the money be spent on?

Personnel costs
Not eligible
Materials
Not eligible
Subcontracting
Not eligible
Equipment
Not eligible
Land
Not eligible
Buildings
Not eligible
Overheads
Not eligible
Travel costs
Not eligible
Other costs
Lump sum: fixed contribution per work package, no cost reporting.
Downloads

Files & forms

Changes

What has changed?

10 November 2026scheme · version 6

Subtitle
Subtitle: ChangedShow
Before

Veiligheidsrisico's van de groene transitie in stedelijke gebieden.

Now

Security risks of the green transition in urban areas.

Description
Description: ChangedShow
Before

Projecten identificeren en analyseren nieuwe veiligheidsrisico's van innovatieve technologieën die in stedelijke en randstedelijke gebieden voor de groene transitie worden ingezet, en ontwikkelen tools om de gevolgen voor veiligheid te meten en te beheersen.

Now

Projects identify and analyse new security risks of innovative technologies deployed in urban and peri-urban areas for the green transition, and develop tools to measure and manage the impact on security.

Short description
Short description: ChangedShow
Before

Horizon Europe-onderzoeksactie (lump sum, circa € 4 mln, naar verwachting 1 project) naar nieuwe veiligheidsrisico's van groene technologie in stedelijke en randstedelijke gebieden, met minimaal 3 practitioners.

Now

Horizon Europe research action (lump sum, around €4 million, 1 project expected) on new security risks of green technology in urban and peri-urban areas, with at least 3 practitioners.

Cycle
Cycle: ChangedShow
Before

Uitslag naar verwachting circa 5 maanden na de deadline, ondertekening van de subsidieovereenkomst circa 8 maanden na de deadline (General Annex F).

Now

Outcome expected around 5 months after the deadline, signature of the grant agreement around 8 months after the deadline (General Annex F).

Note on the total budget
Note on the total budget: ChangedShow
Before

Indicatief topicbudget, naar verwachting 1 project.

Now

Indicative topic budget, 1 project expected.

Note on the maximum
Note on the maximum: ChangedShow
Before

Geen bindend maximum; de Commissie acht circa € 4,0 mln EU-bijdrage per project passend (lump sum).

Now

No binding maximum; the Commission considers an EU contribution of around €4.0 million per project appropriate (lump sum).

Cumulation
Cumulation: ChangedShow
Before

Geen dubbele financiering uit de EU-begroting: een actie kan maar één EU-subsidie krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd. Combinatie met een EU-werkingssubsidie kan als het project buiten het werkprogramma van die subsidie valt en de kosten gescheiden blijven.

Now

No double funding from the EU budget: an action may receive only one EU grant (except EU Synergy grants) and the same costs may never be declared under two different EU actions. Combination with an EU operating grant is possible if the project falls outside the work programme of that grant and the costs are kept separate.

Search engine title
Veiligheid van de groene transitie in steden (Horizon CL3) becomes Security of the green transition in cities (Horizon CL3)
Search engine description
Search engine description: ChangedShow
Before

Horizon Europe-onderzoeksactie (circa € 4 mln) naar veiligheidsrisico's van groene technologie in stedelijke gebieden.

Now

Horizon Europe research action (around €4 million) on security risks of green technology in urban areas.

Keywords
Cluster 3 Civil Security for Society, groene transitie, Horizon Europe, HORIZON-CL3-2026-01-INFRA-02, kritieke infrastructuur, stedelijke veiligheid becomes Cluster 3 Civil Security for Society, critical infrastructure, green transition, Horizon Europe, HORIZON-CL3-2026-01-INFRA-02, urban security
Language
Dutch (Netherlands) becomes British English
Required attachments
Aanvraagformulier deel A: administratieve gegevens, samengevatte begroting en call-specifieke vragen (online in het indieningssysteem); Aanvraagformulier deel B: technische beschrijving (als pdf uploaden); Gedetailleerde begrotingstabel (lump sum); Tabel 'Information about security practitioners' in het aanvraagformulier, voor de verplichte deelnemers uit de veiligheidspraktijk becomes Application form Part A: administrative data, summary budget and call-specific questions (online in the submission system); Application form Part B: technical description (upload as PDF); Detailed budget table (lump sum); Table 'Information about security practitioners' in the application form, for the mandatory participants from security practice
Procedure
Procedure: ChangedShow
Before

Aanvragen via het Funding & Tenders Portal met een EU Login en een PIC-nummer; single-stage; deadline 17:00 uur Brusselse tijd; beheerd door European Research Executive Agency (REA).

Now

Apply via the Funding & Tenders Portal with an EU Login and a PIC number; single-stage; deadline 17:00 Brussels time; managed by the European Research Executive Agency (REA).

Notes per cost type
Notes per cost type: ChangedShow
Before

Other costs: Lump sum: vaste bijdrage per werkpakket, geen kostenverantwoording.

Now

Other costs: Lump sum: fixed contribution per work package, no cost reporting.

Why this scheme
Why this scheme: ChangedShow
Before

De groene transitie in steden veilig laten verlopen.

Now

Ensuring that the green transition in cities proceeds securely.

In brief
In brief: ChangedShow
Before

Who: Consortia van ten minste drie onafhankelijke rechtspersonen, elk uit een ander land (ten minste één uit een EU-lidstaat), met als begunstigden ten minste drie practitioners uit EU-lidstaten of geassocieerde landen, zoals exploitanten van kritieke infrastructuur, civiele bescherming of hulpdiensten. In China gevestigde rechtspersonen mogen niet deelnemen.

What for: Onderzoek naar de veiligheidsuitdagingen van de groene transitie in stedelijke en randstedelijke gebieden, zodat die transitie veilig verloopt.

What you get: Een lump sum; de Commissie acht een EU-bijdrage van circa € 4 miljoen per project passend. Het indicatieve budget voor dit topic is € 4 miljoen.

What you need to do: Dien uiterlijk 5 november 2026 om 17.00 uur (Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal; de call opent op 6 mei 2026. U voegt deel A en deel B van het aanvraagformulier toe, plus de gedetailleerde begrotingstabel voor de lump sum.

Now

Who: Consortia of at least three independent legal entities, each from a different country (at least one from an EU Member State), with at least three practitioners from EU Member States or Associated Countries as beneficiaries, such as critical infrastructure operators, civil protection or emergency services. Legal entities established in China may not participate.

What for: Research into the security challenges of the green transition in urban and peri-urban areas, so that this transition proceeds securely.

What you get: A lump sum; the Commission considers an EU contribution of around €4 million per project appropriate. The indicative budget for this topic is €4 million.

What you need to do: Submit a proposal in a single stage via the Funding & Tenders Portal by 5 November 2026 at 17:00 Brussels time; the call opens on 6 May 2026. You add Part A and Part B of the application form, plus the detailed budget table for the lump sum.

Goals
Goals: 5 removed, 5 newShow
Removed

Nieuwe veiligheidsrisico's in kaart Mogelijke nieuwe veiligheidsrisico's van innovatieve technologieën in stedelijke en randstedelijke gebieden worden geïdentificeerd en geanalyseerd, inclusief de gevolgen van incidenten met nieuwe technologieën en milieu- en klimaatrisico's.

Tools om veranderingen te meten Er komen innovatieve tools om veranderingen in (rand)stedelijke gebieden door de groene transitie te meten, voor zover ze veiligheid en weerbaarheid raken.

Maatregelen getoetst en draagvlak vergroot Maatregelen tegen veiligheidsrisico's in gebieden met groene technologieën worden geverifieerd, en het bewustzijn en maatschappelijk draagvlak voor de veiligheidsaspecten van de groene transitie groeien.

Veilige toeleveringsketens Veiligheid, betrouwbaarheid en weerbaarheid van de toeleveringsketens van groene technologieën worden geanalyseerd, inclusief technologische en grondstofafhankelijkheden en de aansluiting op Europese strategische autonomie.

Evaluatiemethoden voor overheden en operators Overheden en operators van kritieke infrastructuur krijgen efficiënte evaluatiemethoden voor de veilige uitrol en integratie van nieuwe technologieën in (rand)stedelijke gebieden.

New

New security risks mapped Potential new security risks of innovative technologies in urban and peri-urban areas are identified and analysed, including the consequences of incidents involving new technologies and environmental and climate risks.

Tools to measure changes Innovative tools are developed to measure changes in (peri-)urban areas caused by the green transition, insofar as they affect security and resilience.

Measures verified and public support increased Measures against security risks in areas with green technologies are verified, and awareness and public acceptance of the security aspects of the green transition grow.

Secure supply chains The security, reliability and resilience of green technology supply chains are analysed, including technological and raw material dependencies and alignment with European strategic autonomy.

Evaluation methods for authorities and operators Public authorities and critical infrastructure operators gain efficient evaluation methods for the secure deployment and integration of new technologies in (peri-)urban areas.

Show 5 earlier versions

6 November 2026scheme · version 5

De call is gesloten; er zijn 16 voorstellen ingediend.

Status
Open becomes Closed
Budget status date
Added: 5 November 2026
Note on the budget status
Note on the budget status: AddedShow
Now

16 proposals submitted (submission numbers, 5 Nov 2026).

Number of applications
Added: 16

19 October 2026scheme · version 4

Conditions
Conditions: 3 removed, 4 newShow
Removed

Consortium van minimaal 3 partijen Drie onafhankelijke juridische entiteiten uit drie verschillende EU-lidstaten of geassocieerde landen, waarvan minimaal één uit een lidstaat (General Annex B).

Minimaal 3 practitioners Deelname als begunstigde van minimaal 3 relevante practitioners uit EU-lidstaten of geassocieerde landen: exploitanten van kritieke infrastructuur, autoriteiten voor weerbaarheid van kritieke infrastructuur, civiele bescherming of hulpdiensten.

Geen deelname van Chinese entiteiten In China gevestigde juridische entiteiten mogen niet deelnemen aan onderzoeks- en innovatieacties onder deze destination (General Annex B).

New

Unless otherwise provided for in the specific call/topic conditions, only legal entities forming a consortium are eligible to participate in actions provided that the consortium includes, as beneficiaries, three legal entities independent from each other and each established in a different country as follows: – at least one independent legal entity established in a Member State; and – at least two other independent legal entities, each established in different Member States or Associated Countries.

Legal entities established in China are not eligible to participate in both Research and Innovation Actions (RIAs) and Innovation Actions (IAs) falling under this destination.

This topic requires involvement as beneficiaries of at least 3 relevant practitioners from EU Member States or Associated Countries. Depending on the specific focus of the proposal submitted, these practitioners should represent one or several of the following portfolios: - critical infrastructure operator, - authority responsible for critical infrastructure resilience, - civil protection authority, - safety or security first responders,

If projects use satellite-based earth observation, positioning, navigation and/or related timing data and services, beneficiaries must make use of Copernicus and/or Galileo/EGNOS (other data and services may additionally be used).

In brief
In brief: AddedShow
Now

Who: Consortia van ten minste drie onafhankelijke rechtspersonen, elk uit een ander land (ten minste één uit een EU-lidstaat), met als begunstigden ten minste drie practitioners uit EU-lidstaten of geassocieerde landen, zoals exploitanten van kritieke infrastructuur, civiele bescherming of hulpdiensten. In China gevestigde rechtspersonen mogen niet deelnemen.

What for: Onderzoek naar de veiligheidsuitdagingen van de groene transitie in stedelijke en randstedelijke gebieden, zodat die transitie veilig verloopt.

What you get: Een lump sum; de Commissie acht een EU-bijdrage van circa € 4 miljoen per project passend. Het indicatieve budget voor dit topic is € 4 miljoen.

What you need to do: Dien uiterlijk 5 november 2026 om 17.00 uur (Brusselse tijd) in één ronde een voorstel in via het Funding & Tenders Portal; de call opent op 6 mei 2026. U voegt deel A en deel B van het aanvraagformulier toe, plus de gedetailleerde begrotingstabel voor de lump sum.

18 October 2026scheme · version 3

About the scheme
About the scheme: AddedShow
Now

Climate change and environmental degradation are an existential threat to the world, and the green transition is a critical component of the EU's strategy to reduce and mitigate their impacts, as well as to contribute to the European competitiveness. This approach is also part of the effort to transform Europe into a modern, resource-efficient, resilient and competitive economy. However, rapid deployment of new and emerging technologies, such as, but not limited to: green and grid-interactive roofs and walls, solar power installations, electric vehicle charging stations, energy storages, smart sensors and surveillance systems, green transportation systems, nature-based or other sustainable or reused construction materials, or specific infrastructure solutions may create security risks through new interdependencies including legacy infrastructure, the accumulation of deployed solutions, or otherwise create new potential risks and hazards of unknown scale and origin.

15 October 2026scheme · version 2

Cycle
Cycle: AddedShow
Now

Uitslag naar verwachting circa 5 maanden na de deadline, ondertekening van de subsidieovereenkomst circa 8 maanden na de deadline (General Annex F).

Cumulation
Cumulation: AddedShow
Now

Geen dubbele financiering uit de EU-begroting: een actie kan maar één EU-subsidie krijgen (behalve EU Synergy grants) en dezelfde kosten mogen nooit bij twee verschillende EU-acties worden gedeclareerd. Combinatie met een EU-werkingssubsidie kan als het project buiten het werkprogramma van die subsidie valt en de kosten gescheiden blijven.

Keywords
Added: Cluster 3 Civil Security for Society, groene transitie, Horizon Europe, HORIZON-CL3-2026-01-INFRA-02, kritieke infrastructuur, stedelijke veiligheid
Required attachments
Added: Aanvraagformulier deel A: administratieve gegevens, samengevatte begroting en call-specifieke vragen (online in het indieningssysteem); Aanvraagformulier deel B: technische beschrijving (als pdf uploaden); Gedetailleerde begrotingstabel (lump sum); Tabel 'Information about security practitioners' in het aanvraagformulier, voor de verplichte deelnemers uit de veiligheidspraktijk
Goals
Goals: 5 newShow
New

Nieuwe veiligheidsrisico's in kaart Mogelijke nieuwe veiligheidsrisico's van innovatieve technologieën in stedelijke en randstedelijke gebieden worden geïdentificeerd en geanalyseerd, inclusief de gevolgen van incidenten met nieuwe technologieën en milieu- en klimaatrisico's.

Tools om veranderingen te meten Er komen innovatieve tools om veranderingen in (rand)stedelijke gebieden door de groene transitie te meten, voor zover ze veiligheid en weerbaarheid raken.

Maatregelen getoetst en draagvlak vergroot Maatregelen tegen veiligheidsrisico's in gebieden met groene technologieën worden geverifieerd, en het bewustzijn en maatschappelijk draagvlak voor de veiligheidsaspecten van de groene transitie groeien.

Veilige toeleveringsketens Veiligheid, betrouwbaarheid en weerbaarheid van de toeleveringsketens van groene technologieën worden geanalyseerd, inclusief technologische en grondstofafhankelijkheden en de aansluiting op Europese strategische autonomie.

Evaluatiemethoden voor overheden en operators Overheden en operators van kritieke infrastructuur krijgen efficiënte evaluatiemethoden voor de veilige uitrol en integratie van nieuwe technologieën in (rand)stedelijke gebieden.

6 October 2026scheme · version 1 · first publication

Source

Contact & source

Funding body
European Research Executive Agency
Last verified
15 November 2026 by the Twin editors
Start your application

Start your HORIZON-CL3-2026-01-INFRA-02 application
in Twin.

Twin helps you write your application, based on the scheme and your own project documents. You stay in control of every text.